--------------------------------------------------------------------------------8/20--------------------------------------------------------------------------------
3
4
5
1
6
Cable
7
Remove all inner parts from the cable pipe at the SAB Cab (1) ( nut (5), cable fastener (3), pipe(4))
(see Figure 4)
Put all the removed parts (nut (5), cable fastener (3), pipe (4),) and the cable pipe of the SAB Cab
as well (1 to 4) to the cable.
Figure 3 Mounting for the cable
Remove the outer isolation of the cable at a length of 6cm .
Remove the isolation of the wires at a length of 6mm and stick a covering hull to the litz wire.
Put the cable to the cable pipe. The length of the cable coming out the SAB Cab must long enough to
do all further installation steps in an easy way.
Stick the pipe (4) into the cable fastener (3).
Stick the cable fastener (3) into the cable pipe.
Connect the cables into the right places of the MINI-COMBICON-Connectors (6).
The pin assignment is shown in the figure below.
Put the MINI-COMBICON-Connectors into the SAB cab. Look after the color coding.