Operating Procedures
5-1 Startup Procedures (Single Unit)
Before starting up the UPS system, be sure to check the following items first.
Ensure all circuit breakers are cut off and switched to
OFF
, as well as the breaker
or fuse of the external battery cabinet.
Confirm if the locking latch is located at
“
”
.
Confirm if there is no voltage potential between
NEUTRAL
and
Ground
.
Confirm if the input power source matches the rated voltage, frequency, phase
and battery of the UPS that you have installed.
Q4 Q3 Q2 Q1
Fail
On
Off
Q1: Input Circuit Breaker
Q2: Bypass Input Circuit Breaker
Q3: Manual Bypass Switch
Q4: Output Circuit Breaker
Содержание 80 / 120 kVA
Страница 14: ...3 1 3 General View 3 1 Appearance LCD Display and Control Panel ...
Страница 15: ...3 2 3 1 1 Dimensions 80kVA Fig 3 1 Power Unit 80kVA Fig 3 2 External Battery Pack 80 kVA cabinet size ...
Страница 16: ...3 3 3 1 2 Dimensions 120kVA Fig 3 3 Power Unit 120 kVA Fig 3 4 External Battery Pack 120 kVA cabinet size ...
Страница 36: ...4 3 4 4 Unpacking Procedures 4 4 1 Protect 3 M 2 0 80 kVA ...
Страница 37: ...4 4 4 4 2 Protect 3 M 2 0 120 kVA ...
Страница 57: ...6 3 Fail On Off Fail On Off ...