3 Installation
42
Step 5
Fix with the flat head screws, as shown in Figure3-28.
Figure3-28
Fix with the flat head screws
----End
3.4.8 Wiring of Parallel System
Step 1
Install the battery and UPS of parallel system separately according to
3.3 Mechanical
Installation
.
Step 2
Connect the wires of input, output, battery and grounding in parallel system on the basis of
Figure3-29, Figure3-30, Figure3-31 or Figure3-32.
10kVA-20kVA
Содержание IST9
Страница 1: ...l un I Jet _________ __ AEC IST9 1 0 20 https www uni jet com catalog ibp on line ibp aec ist9...
Страница 2: ...UPS IST9 10 20 kVA User Manual...
Страница 3: ......
Страница 9: ......
Страница 52: ...3 Installation 43 Figure3 29 Diagram of 33 mode parallel system wiring of 10kVA 20kVA UPS...
Страница 53: ...3 Installation 44 Figure3 30 Diagram of 31 mode parallel system wiring of 10kVA 20kVA UPS 30kVA 40kVA...
Страница 54: ...3 Installation 45 Figure3 31 Diagram of 33 mode parallel system wiring of 30kVA 40kVA UPS...
Страница 82: ......