GESTEK
Lab
Report No.: 0609083 Rev. 1
N0 3, Pau-Tou-Tsuo Valley, Chia-Pau Tsuen, Lin Kou Hsiang, Taipei County, Taiwan, R.O.C. Tel:886-2-2603-5321 Fax:886-2-2603-5325
Accredited Lab. Of BSMI, NEMKO, NVLAP Page 2 of 59
Listed Lab. of AUSTEL, Commerce, FCC, VCCI
NVLAP Lab Code:200085-0
TA B L E O F C O N T E N T S
Description
Page
1.
CERTIFICATION 3
2.
SUMMARY OF TEST RESULTS
4
3.
GENERAL INFORMATION
5
3.1
PRODUCT DESCRIPTION
5
3.2
TEST MODES & EUT COMPONENTS DESCRIPTION
5
3.3
CONFIGURATION OF THE SYSTEM UNDER TEST
6
3.4
TEST FACILITY
10
4.
CONDUCTED EMISSION MEASUREMENT
11
4.1
TEST EQUIPMENTS
11
4.2
TEST METHOD
11
4.3
BLOCK DIAGRAM OF TEST SETUP
11
4.4
CONDUCTED EMISSION LIMITS
12
4.5
EUT CONFIGURATION ON MEASUREMENT
12
4.6
CONDUCTED EMISSION DATA
12
4.7
OPERATING CONDITIONS OF THE EUT
12
4.8
CONDUCTED EMISSION MEASUREMENT RESULTS
13
5.
RADIATED EMISSION MEASUREMENT
15
5.1
TEST EQUIPMENT
15
5.2
TEST METHOD
15
5.3
BLOCK DIAGRAM OF TEST SETUP
16
5.4
RADIATED EMISSION LIMITS
17
5.5
EUT CONFIGURATION
18
5.6
OPERATING CONDITIONS OF THE EUT
18
5.7
RADIATED EMISSION DATA
18
5.8
RADIATED EMISSIONS MEASUREMENT RESULTS
19
6.
HARMONIC CURRENT EMISSIONS, VOLTAGE
FLUCTUATIONS AND FLICKER MEASUREMENT
22
6.1
TEST EQUIPMENT
22
6.2
TEST METHOD
22
6.3
BLOCK DIAGRAM OF TEST SETUP
22
6.4
LIMITS OF HARMONIC CURRENT EMISSIONS
23
6.5
OPERATING CONDITIONS OF THE EUT
23
6.6
TEST PROCEDURE
23
6.7
TEST RESULT
23
7.
ESD IMMUNITY TEST
26
7.1
TEST EQUIPMENT
26
7.2
TEST METHOD
26
7.3
BLOCK DIAGRAM OF TEST SETUP
26
7.4
SEVERITY LEVELS
27
7.5
OPERATING CONDITIONS OF THE EUT
27
7.6
TEST PROCEDURE
27
7.7
TEST RESULT
28
8.
RF FIELD STRENGTH SUSCEPTIBILITY TEST
29
8.1
TEST EQUIPMENT
29
8.2
TEST METHOD
29
8.3
BLOCK DIAGRAM OF TEST SETUP
29
8.4
SEVERITY LEVELS
30
8.5
OPERATING CONDITIONS OF THE EUT
30
8.6
TEST PROCEDURE
30
8.7
TEST RESULT
31
9.
ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST32
9.1
TEST EQUIPMENT
32
9.2
TEST METHOD
32
9.3
BLOCK DIAGRAM OF TEST SETUP
32
9.4
SEVERITY LEVELS
33
9.5
OPERATING CONDITIONS OF THE EUT
33
9.6
TEST RESULT
34
10.
SURGE IMMUNITY TEST
35
10.1
TEST EQUIPMENT
35
10.2
TEST METHOD
35
10.3
BLOCK DIAGRAM OF TEST SETUP
35
10.4
SEVERITY LEVELS
35
10.5
OPERATING CONDITIONS OF THE EUT
36
10.6
TEST PROCEDURE
36
10.7
TEST RESULT
37
11.
CONDUCTED DISTURBANCE SUSCEPTIBILITY TEST
38
11.1
TEST EQUIPMENT
38
11.2
TEST METHOD
38
11.3
BLOCK DIAGRAM OF TEST SETUP
38
11.4
SEVERITY LEVELS
38
11.5
OPERATING CONDITIONS OF THE EUT
38
11.6
TEST PROCEDURE
39
11.7
TEST RESULT
40
12.
VOLTAGE DIPS AND SHORT INTERRUPTIONS TEST
41
12.1
TEST EQUIPMENT
41
12.2
TEST METHOD
41
12.3
BLOCK DIAGRAM OF TEST SETUP
41
12.4
SEVERITY LEVELS
41
12.5
OPERATING CONDITIONS OF THE EUT
41
12.6
TEST PROCEDURE
41
12.7
TEST RESULT
42
13.
PHOTOGRAPHS FOR TEST
43
13.1
TEST PHOTOGRAPHS FOR CONDUCTION
43
13.2
TEST PHOTOGRAPHS FOR RADIATED
44
13.3
TEST PHOTOGRAPHS FOR HARMONIC/FLICKER
45
13.4
TEST PHOTOGRAPHS FOR ESD
46
13.5
TEST PHOTOGRAPHS FOR ESD TEST POINTS
47
13.6
TEST PHOTOGRAPHS FOR RS
48
13.7
TEST PHOTOGRAPHS FOR EFT
49
13.8
TEST PHOTOGRAPHS FOR SURGE
50
13.9
TEST PHOTOGRAPHS FOR CS
51
13.10
TEST PHOTOGRAPHS FOR DIPS
52
14.
PHOTOGRAPHS FOR PRODUCT
53
15.
EMI/EMS REDUCTION METHOD DURING COMPLIANCE
TESTING 59