Page 13
High Efficiency - High Intensity
KMI_02142017al
INSTALLATION INSTRUCTIONS
Wiring Diagram - One Stage
Single-Stage Electrical Connection / Wiring Diagram
•
Connect the electrical lead wires to the gas valve control using these symbols (L1, N, and GND) and make
sure to ground the valve.
•
Verify the input voltage going to the control assembly is a 24 V 60Hz AC before connecting to the valve.
TH
V1
24V
V2
GND
S1
DSI
HV
THIS BLUE WIRE
IS ONLY USED WITH CNE
CONTROL MODULE
YELLOW
GREEN
BLUE
BROWN
RED
GAS
PRESSURE
SWITCH
OPTIONAL FIELD SUPPLIED / WIRED
RED
GREEN
PINK
TSTAT*
TSTAT*
L1
NEUTRAL
TRANSFORMER
120V
24V
GAS VALVE
FLAME SENSOR
IGNITER
GREEN
BURNER
Содержание KMI
Страница 1: ...Installation Operation and Service Instructions KMI RANGE HIGH EFFICIENCY HIGH INTENSITY HEATERS ...
Страница 2: ......
Страница 23: ......