Page 9
High Efficiency - High Intensity
KMI_02142017al
INSTALLATION INSTRUCTIONS
Air Plate Installation Instructions
M5 SCREWS (QTY 4)
VENTURE NECK
AIR PLATE
ORIFICE
ORIFICE HOUSING
SINGLE STAGE
WARNING
◊
Before the orifice housing is mounted to the Venturi neck, the Air Plate and orifice sizes must be
compared with the Rating plate specifications.
1.
Remove the cable ties (not shown) from the Venturi Neck (some infrared heaters do not have any air
plates, and therefore no cable ties)
2.
Push the orifice housing into the Venturi Neck and screw it tight using four M5 screws provided.
Single-Stage Air Plate Installation
Содержание KMI
Страница 1: ...Installation Operation and Service Instructions KMI RANGE HIGH EFFICIENCY HIGH INTENSITY HEATERS ...
Страница 2: ......
Страница 23: ......