MOUNTING THE BOILER

Please ensure that all current local by laws and national building regulations are consulted 
prior to installation along with current codes of practice. 

 
The unit must be mounted in a vertical position accessible for servicing. Effectively this 
means allowing front facing access to remove the outer door casing to access the eGlow. 

 
Please check load bearing and ensure correct fixing is used. There are four holes in the 
casing for this purpose. 

 
The 22mm flow and return pipes are at the bottom of the boiler, and should be connected 
using compression fittings. Do not solder connections within 600mm of the boiler. Flow is 
the left pipe, marked red, return is the right pipe, marked blue. We suggest you install the 
means to isolate and drain the boiler independently.

SAFETY

No special precautions are required, however due care should be taken in installing, 
commissioning and servicing to prevent electric shock or water leakage.

INSTALLATION

Only persons competent to do so may fit this appliance. 

 
Calculate space heating requirements and allow an extra 3kW for hot water provision if an 
indirect cylinder is to be installed. Advance recommend an Advance Appliances stainless 
steel pre-plumbed unvented cylinder and would always advise customers to consider 
renewable energy such as solar to contribute toward the generation of domestic hot water. 
Using a direct (electric) Advance Appliances unvented cylinder will reduce installation cost. 

 
Controls such as room thermostats and programmers or timers must be installed to comply 
with current Part L requirements. 

 
Ensure that the correct appliance is fitted, for example by sizing to meet demand and by 
choosing underfloor or central heating models. 

 
The system must be properly flushed and have inhibitor added according to manufacturer’s 
specifications. Always choose a recognised brand and inhibit to the correct dilution. Always 
flush out completely as any chlorine based chemicals can attack stainless steel components. 
After drain down, even a partial one, inhibitor levels must be topped up. 

 
Y, W or S plan systems may be used with the eGlow. 

 
Primary pipe work in enclosed spaces such as boiler cupboards should be insulated. Fit 
isolation valves. 

 
It is 

important

 to have a locked open radiator or open towel rail in the system.  

 
Thermostatic radiator valves are recommended.  Use a twin pipe 22mm system with 15mm 
tee off to radiators.

Содержание EG 12

Страница 1: ...INSTALLATION AND USER GUIDE 6 9 12kW ELECTRIC BOILER PLEASE RETAIN FOR REFERENCE ISSUE 2 1220...

Страница 2: ...eGlow is controlled externally with a programmer and room thermostat arrangement with voltage free switching not supplied There is a connector in the boiler casing for this purpose Standard central he...

Страница 3: ...TAGE 90 95 C 90 95 C 90 95 C NOM HEAT OUTPUT 20 000 BTU 30 000 BTU 40 000 BTU AUTO AIR VENT FITTED FITTED FITTED FLOW SWITCH FITTED FITTED FITTED AUTO BY PASS FITTED FITTED FITTED MIN PRESSURE COLD FI...

Страница 4: ...on if an indirect cylinder is to be installed Advance recommend an Advance Appliances stainless steel pre plumbed unvented cylinder and would always advise customers to consider renewable energy such...

Страница 5: ...a double pole RCD capable of breaking the full current load Remember that the full house loading must be taken into consideration when calculating mains demand Refer to IEE regulations for wiring size...

Страница 6: ...boiler controls are fully automatic The LED will turn green showing that the boiler is powered up and awaiting demand When heating demand is on set the programmer and room thermostat to call for deman...

Страница 7: ...D may flash red indicating overheat The unit is protected by the PCB controller in addition to a thermomechanical device The appliance will reset itself when it cools If the overheat recurs please ens...

Страница 8: ...8 SCHEMATIC AUTO AIR VENT HIGH LIMIT THERMOSTATS THERMISTER RETURN CONTACTOR MAINS FLOW SWITCH 3 KW PODS A RATED PUMP FLOW AUTO BYPASS CONTROL PCB...

Страница 9: ...e to ensure the voltage does not go below the minimum level Yes No Check voltage input R H contactor Yes No Go back to source and check wiring Faulty wires from block to contactor Check ZERO voltage d...

Страница 10: ...there should be con nuity Yes No Ensure system is fully purged of air If yes replace ow switch Disconnect all pods Turn on the boiler Check each of the pod leads in pairs for power note that the pods...

Страница 11: ...E IS 21 OHMS Mode SW1 SW2 SW3 SW4 Central hea ng O X X X Under oor On X X X 3KW X O O X 6KW X O On X 9KW X On O X 12KW X On On X Enable main contactor X X X On Disable main contactor X X X O Connect e...

Страница 12: ...stallation date Warranty is registered on Advance Appliances Website It is installed correctly and the benchmark paperwork is completed It is used for its intended purpose It is operated properly It h...

Отзывы: