
ADT Model 7900 Uno Dicing Series Installation Supplement
Table of Contents
P/N 97910-9000-001-01 Ver. 04/2014
vii
Parts and Accessories Shipped with the System ________________ 19
Positioning the System on your Production Floor _______________ 21
Securing the System to the Production Floor___________________ 23
Connecting Utilities to the System ___________________________ 23
Connecting the Main Power Cord to the Power Supply ___________ 25
Setting Date and Time Properties ____________________________ 25
Installing the Chuck _______________________________________ 25
General Precautions ________________________________________ 25
Securing the Cutting Chuck to the Theta Table ____________________ 26
Testing Chuck Flatness ______________________________________ 27
Installing the Blades _______________________________________ 29
Performing Chuck to Non-Chuck Delta Measurement _______________ 31
Performing a Cut Test _______________________________________ 31