OPC7000 series
2
© ads-tec Industrial IT GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany
Available Interfaces (OPC7008)
Available interfaces (OPC7013-7022)
Order of steps during commissioning
Check for operational readiness
Front panel operation keys (basic function)
Opening the service slot (OPC7008)
Opening the service slot (OPC7013-7022)
Replacing the lithium battery (OPC7000 series)
Replacing the HDD (hard disk) (OPC7013-7022)
Replacing the fan (OPC7013-7022)
Replacing the working memory (RAM) (OPC7013-7022)
Replacing the mSATA modules (OPC7000 series)