OPC7000 series
28
© ads-tec Industrial IT GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany
4.11 Order of installation (OPC7008)
ACHTUNG
The screws have to be tighten with a torque of
0.25 NM
1) Before the device can be integrated in the panel, the tensioner fixing screws must be loosened until
the tensioners open.
(Item 1 - item 2).
Information:
Tensioners can be opened by using an Allen key of 3 mm size.