![Adisa ADI CD 375 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/adisa/adi-cd-375/adi-cd-375_technical-manual-of-installation-use-and-maintenance_2851531013.webp)
ADI CD boiler - Technical Manual
13
8. POWER MODULATION AND COMBUSTION SYSTEM
12
11
7
15
1
5
13
15
5
11
14
6
7
3
2
8
9
4
10
NOTE: this is a guide diagram; according to the model, the position of electrodes, pilot flame, motor fan and gas
shut-off valve can vary.
Gas filter in models ADI 850 and 950:
In these models, the gas filter is supplied dismantled inside the boiler, for an
easier and safer transport.
It must be assembled once the boiler is in the installation.
The minimum gas pressure gauge is connected to the gas filter inlet.
In order to rotate the motor-fan group and take off the burner, you have to
remove first the gas filter and then proceed according to the instructions indicated
in the corresponding chapter (19.1).
(1) Burner of fire resisting alloy mesh
(2) Ionization electrode (checking the flame
presence)
(3) Ignition electrode
(4) Pilot flame
(5) Venturi for the air-gas mix
(6) Gas shut-off valve
(7) Gas inlet (boiler gas connection to the
installation)
(8) Fan for the air-gas mix
(9) Variable speed motor-fan
(10) Air inlet
(11) Flange of the group motor-fan, to be coupled
to the flange of the boiler heat exchanger
(12) Ignition-ionization kit
(13) Pressure connection for the gas valve
(just
models CD 200 and higher)
(15) Air filter (just models CD 200 and higher)
Содержание ADI CD 375
Страница 1: ...1 º º ADI CD CONDENSING BOILER TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE V 07 2017 ...
Страница 7: ...ADI CD boiler Technical Manual 7 Models ADI CD 200 and higher A C D B J H G F E R S ...
Страница 34: ...ADI CD boiler Technical Manual 34 12 1 Electric drawing ADI CD 70 750 ...
Страница 35: ...ADI CD boiler Technical Manual 35 12 2 Electric drawing ADI CD 850 950 ...