Adisa ADI CD 375 Скачать руководство пользователя страница 1

                   

 

º

º

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADI CD 

CONDENSING BOILER 

 

TECHNICAL MANUAL  
OF INSTALLATION, USE AND MAINTENANCE 

 
V. 07/2017 

Содержание ADI CD 375

Страница 1: ...1 º º ADI CD CONDENSING BOILER TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE V 07 2017 ...

Страница 2: ...formation visualized on the display ____________________________________________________ 25 11 CONTROL OF SEVERAL BOILERS CASCADED SYSTEM ___________________________________________ 26 11 1 Boilers sequence included _____________________________________________________________________ 26 11 2 External control signal 0 10 V to regulate start up and power modulation of each boiler_________________ 3...

Страница 3: ...______________________________________________________________ 56 17 7 5 Water quality of the installation________________________________________________________________ 57 17 7 6 System drawings____________________________________________________________________________ 58 18 THE BOILER START UP_________________________________________________________________________ 62 18 1 Before the start up ...

Страница 4: ...ctive Ecodesign ErP Energy related Products Boiler certified as Condensing flow temperature up to 90ºC no limit of return temperature Boiler heat exchanger in stainless steel Power outputs from 70 5 to 904 kW Maximum efficiency per year Variable temperature on boiler Boiler power modulation according to the demands of the installation High reduction of stop start cycles Minimum heat losses due to ...

Страница 5: ...450 to 750 850 to 950 GAS BOILERS DIR 2009 142 EEC 1312CO5826 AND EFFICIENCY DIR 92 42 EEC 1312CO5830 1312CO5824 The European Directive of Boilers Efficiency dir 92 42 EEC is only applied to boilers from 4 to 400 kW The ADI CD boilers are in compliance with the following regulations and directives European Directive 2009 142 CE for Gas devices European Directive 92 42 CE for Boilers efficiencies t...

Страница 6: ...it D Flame visor E Motor fan variable speed F Fan G Venturi for air inlet and gas mix H Gas shut off valve J Boiler control unit and power modulation L Hot water flow M Hot water return N Flues outlet P Gas connection Q Air pressure switch R Air filter S Ignition transformer T Gas pressure switch U Pressure sensor V Air vents manual Models ADI CD 70 to 175 view from above B D F E C S H P T U L M V...

Страница 7: ...ADI CD boiler Technical Manual 7 Models ADI CD 200 and higher A C D B J H G F E R S ...

Страница 8: ... 175 450 185 112 5 150 1110 774 198 963 655 570 66 121 134 3 200 660 305 177 5 175 1583 937 403 1156 940 775 61 134 217 3 250 660 305 177 5 175 1583 937 403 1156 940 775 61 134 217 3 325 810 360 225 250 1583 936 445 1156 940 775 61 134 292 375 810 360 225 250 1583 936 445 1190 940 775 61 134 249 3 450 810 360 225 250 1583 936 445 1190 940 775 61 134 249 3 Attention Heights H HG HA HF without takin...

Страница 9: ...k feet supplied with the boiler dimension SB Note data in the present document are liable to changes without prior warning ADI CD 4 5 6 9 12 Diam Diam Diam Diam 70 2 threaded 3 4 3 4 H 85 2 threaded 1 3 4 H 105 2 threaded 1 3 4 H 120 2 threaded 1 3 4 H 175 2 threaded 1 3 4 H 200 2 to be flanged PN 6 1 1 4 1 1 2 M 250 2 to be flanged PN 6 1 1 4 1 1 2 M 325 2 to be flanged PN 6 1 1 4 1 1 2 M 375 2 t...

Страница 10: ...er capacity litres 30 33 34 34 35 86 90 112 118 Max water pressure bar 5 5 5 5 5 5 5 5 5 Water ΔT 10ºC m3 h 6 0 7 3 8 9 10 3 13 9 17 20 7 25 3 30 4 flow ΔT 12ºC m3 h 5 0 6 1 7 5 8 6 11 6 14 2 17 3 21 1 25 4 rate ΔT 15ºC m3 h 4 0 4 9 6 6 9 9 3 11 3 13 8 16 9 20 3 Electric consumption At max output W 47 8 64 6 134 93 3 95 2 131 6 167 4 267 9 435 At min output W 16 7 17 9 23 9 19 1 19 5 31 1 40 7 64 ...

Страница 11: ... 30 4 34 3 38 7 45 5 51 2 Electric Consumption At max output W 767 8 627 4 830 1139 1300 1800 At min output W 124 4 83 82 8 108 4 300 320 Maximum consumption W 767 8 627 4 830 1139 1300 1800 Supply V 1x230 V 1x230 V 1x230 V 1x230 V 3x380 V 3x380 V Natural gas L C V 10 757 kW m3 38 728 MJ m3 Propane gas CONSULT chapter 18 4 2 Electric supply to the boiler ADI CD 450 750 230 V 50 Hz single phase and...

Страница 12: ...ected by means of multiple vertical tubes forming the combustion chamber The vertical tubes generate a big heat transfer surface that uses the sensible heat of the flues During the manufacturing process the boiler is subjected to a strict quality control carried out through a process of three leak tests one with penetrant liquids another one with air pressure and the last one with water pressure T...

Страница 13: ...et In order to rotate the motor fan group and take off the burner you have to remove first the gas filter and then proceed according to the instructions indicated in the corresponding chapter 19 1 1 Burner of fire resisting alloy mesh 2 Ionization electrode checking the flame presence 3 Ignition electrode 4 Pilot flame 5 Venturi for the air gas mix 6 Gas shut off valve 7 Gas inlet boiler gas conne...

Страница 14: ...ill be no gas admission 6 The gas shut off valve controls the gas outlet pressure according to the pressure value in the venturi Note 13 in models CD 200 and higher a coupling pipe between the gas shut off valve and the venturi measures the pressure drop before the mix For lower models there is no pipe the connection between the gas shut off valve and the venturi is internal 8 9 The power modulati...

Страница 15: ...ADI CD boiler Technical Manual 15 Exploded view of the burner fan gas valve assembly for models CD 325 and higher Motor fan rotating forward ADI CD 325 to 750 or backward ADI CD 850 and 950 ...

Страница 16: ...er maintenance Fast answer to the changes of the power demand Thanks to its structure and design noise produced by the combustion is very low and without resonance The cylindrical shape of the burner allows the flame to be homogeneously distributed It is vertically introduced in the boiler The boiler incorporates an ionization flame control The minimum ionization value must always be superior to 5...

Страница 17: ...according to Reduced setpoint Standby circuit is disconnected Frost Protection function activated 4 7471z54 0109 Available information is displayed by pressing the Info button 5 7471z51 0109 Turn the setting knob to select parameters For heating circuits turn the setting knob to increase or decrease the Comfort setpoint 7 4 7 1 4 7 e 0 2 0 9 Selection of heating operation mode Display of informati...

Страница 18: ...ted Heating to Reduced setpoint Programming activated Heating to Frost Protection setpoint Heating temporarily Off Process running please wait ECO function active Change battery Holiday function active Burner in operation Reference to heating circuit only oil gas boiler Maintenance special operation Error messages Selecting Heating Mode 7471z49 0109 This setting is used to switch between the diffe...

Страница 19: ...ns active Automatic summer winter changeover ECO functions and automatic 24 hour heating limit active Selecting Domestic Hot Water Mode The button is used to switch DHW mode on and off The selection made is indicated by a bar which appears below the respective symbol On DHW is heated according to the selected switching program Off No DHW heating but the protective function is active 7471z50 0109 A...

Страница 20: ...elephone customer service According to sensors and optionals connected to the boiler Error messages If this symbol appears an error in the plant occurred Press the Info button and read further information 7471z55e 0209 Maintenance or special operation If this symbol appears a maintenance symbol is shown or the plant has changed to special mode Press the Info button and read further information 747...

Страница 21: ...lay If the basic display is not shown press ESC to return to it Press OK 2 7471z58e 0209 You are on the Enduser level Turn the setting knob until you reach the required parameter Press the Info button for 3 seconds 3 7471z64e 0209 You are now given a choice of user levels Turn the setting knob until you reach the required user level Press OK 4 7471z58e 0209 You are now on the required user level T...

Страница 22: ...circuit 3 DHW Consumer circuit 1 Consumer circuit 2 Boiler Cascade Solar Buffer storage tank DHW storage tank Configuration LPB Fault Maintenance special operation Input output test State Diagnostics cascade Diagnostics heat generation Diagnostics consumer Burner control Parameters setting These examples below show a basic programme process Setting of the time of day and date From initial display ...

Страница 23: ... the setting knob and set Commissioning level Press OK button You are now in the general menu Move the setting knob and set Consumer circuit 1 Press OK button The first parameter 1859 Flow temp setp cons request is the boiler flow temperature setpoint Press OK button and the value will blink While the value is blinking use the setting knob to set the temperature Confirm with OK button Press ESC bu...

Страница 24: ...d Heating circuit 1 710 Comfort setpoint 712 Reduced setpoint 714 Frost Protection setpoint 720 Heating curve slope 730 Summer winter heating limit Heating circuit 2 1010 Comfort setpoint 1012 Reduced setpoint 1014 Frost Protection setpoint 1020 Heating curve slope 1030 Summer winter heating limit Heating circuit 3 1310 Comfort setpoint 1312 Reduced setpoint 1314 Frost Protection setpoint 1320 Hea...

Страница 25: ...utton and the value of percentage will blink While the value is blinking use the setting knob to set the value Confirm with OK button In order to make the maintenance operations the action PID of the controller on the boiler will be deactivated The boiler power can be increased or decreased to make the necessary adjustments combustion check for example 10 6 Data and information visualized on the d...

Страница 26: ... the different boilers of the cascade any message error or diagnostic of the cascaded system is shown in the Master display The sequence control unit Master of boilers allows evaluating the demand of the installation and regulating the boilers according to a strategy of selection This boiler has all the logic control of cascaded system and also regulates the stop start sequence of each boiler acco...

Страница 27: ...on late off 3511 Output band min 40 3512 Output band max 90 3530 Release integral source sequence 20 ºCmin 3531 Reset integral source sequence 300 ºCmin 3532 Reset integral source sequence 120 s 3533 Restart lock 2 min 3540 Auto source sequence changeover 150 h 3541 Auto source sequence exclusion None 3544 Leading source Source 1 3560 Return setpoint minimum 60 ºC 3562 Return influence consumers O...

Страница 28: ...mand for heat cannot be met the difference being the release integral set here another boiler is switched on When the value is increased additional heat sources are switched on at a slower rate When the value is decreased additional heat sources are switched on at a faster rate Reset integral source sequence 3531 When with the heat source currently in operation the demand for heat is exceeded by t...

Страница 29: ...nd lag boiler On completion of the set number of operating hours the boiler sequence in the cascaded system changes It is always the boiler with the next higher device address which assumes the role of the lead boiler Leading source 3544 The boiler selected as the lead boiler is always the first to be switched on or the last to be switched off The other boilers are switched on and off in the order...

Страница 30: ...Example of boilers sequence and power control Example of a possible sequence that can be made multiple options can be chosen In this example the boilers activation and their power control would be made as shown below L e is t B a n d M in 4 0 O n K e s O n K e s s O n K e 3 0 0 2 0 0 1 0 0 4 0 0 Boiler 1 Boiler 2 Boiler 3 Boiler 4 ...

Страница 31: ...emand Voltage V Setpoint ºC 1 22 2 29 3 36 4 43 5 50 6 57 7 64 8 71 9 78 10 85 If it is necessary to get different values of temperature change the following values to get a new linear characteristic m F2 F1 U2 U1 F2 Final Temperature ºC F1 Initial Temperature ºC U2 Final Voltage V U1 Initial Voltage V First of all calculate the new slope of the linear characteristic with the new 2 fixed points in...

Страница 32: ...ote plant control and monitoring via the web Operation via web PC Laptop or Smartphone Connection type Ethernet ADSL is needed for the installation IP address is fixed Display fault messages in the web browser 1 to 4 devices are available to connect boilers Send fault messages to a maximum of 4 e mail recipients Plant visualization in the web browser based on customized plant web pages Requirement...

Страница 33: ... motor fan Protect separately the three phase motor s electric supply L1 L2 L3 from the boiler s electric supply Ph N Legend of the electric drawing 1 FUSE 2 ON OFF SWITCH 3 220V 50Hz ELECTRIC SUPPLY 4 ALARM OUTPUT 5 STATUS OUTPUT 6 BOILER PUMP 7 220V 50Hz ELECTRIC SUPPLY FOR EXTENSION MODULES CLIP IN 8 EXTERNAL DEMAND 0 10V 9 START STOP EXTERNAL CONTACT 10 SAFETY LIMIT THERMOSTAT 11 IGNITION TRAN...

Страница 34: ...ADI CD boiler Technical Manual 34 12 1 Electric drawing ADI CD 70 750 ...

Страница 35: ...ADI CD boiler Technical Manual 35 12 2 Electric drawing ADI CD 850 950 ...

Страница 36: ...rs of small power size ADI CD 70 to 175 the cover is located in the boiler front part and it is accessible by removing the boiler front casing 12 4 Cables entry points In the boiler rear part ADI MEDIUM LARGE POWER ADI SMALL POWER Small power boilers air filter not included optional ...

Страница 37: ...xing circuit the flow sensor of that circuit is not connected it becomes a pump circuit with regard to functions Every boiler is able to control 3 heating circuits with mixing function 3 extension modules are needed It is necessary to give power supply and a bus connection to each extension module AGU2 110 a System drawing 1 Boiler with 3 heating circuits 11 EXTENSION MODULES DIRECTIONS 1 1 2 Exte...

Страница 38: ...ADI CD boiler Technical Manual 38 b Electric drawing 1 Boiler with 3 heating circuits SIEMENS AVS37 294 ADI HT LT 105 325 ADI CD 70 325 ADI HT LT 400 750 ADI CD 375 750 ...

Страница 39: ...rost Protection setpoint 6 ºC 716 1016 1316 Comfort setpoint max 25 ºC 720 1020 1320 Heating curve slope 2 5 721 1021 1321 Heating curve displacement 0 ºC 730 1030 1330 Summer winter heating limit ºC 732 1032 1332 24 hour heating limit 740 1040 1340 Flow temp setpoint min 25 ºC 741 1041 1341 Flow temp setpoint max 85 ºC 770 1070 1370 Boost heating 2 ºC 780 1080 1380 Quick setback Down to Reduced s...

Страница 40: ...stment must be made via parallel displacement Default value 0 o Heating curve adaption 726 1026 1326 Adaption of the heating curve is used by the controller to automatically adapt the heating curve to the prevailing weather conditions In that case a readjustment of heating curve slope and parallel displacement is not required An outside temperature sensor must be connected and a correct adjustment...

Страница 41: ...ion is not active in operating mode Continuously Comfort temperature An outside temperature probe model QAC34 should be added supplied separately from the boiler and not included in the price Display shows the text ECO indicating it is in ECONOMY mode Flow temperature setpoint limits Using this limitation a temperature range for the flow temperature setpoint can be defined If the flow temperature ...

Страница 42: ... TRR Room temperature Reduced setpoint 714 1014 1314 TRF Frost protection setpoint 8704 TAgem Composite outside temperature 8742 8772 8802 TRmod Room temperature model TRwAkt Current room temperature setpoint When a room sensor is used there is a choice of 3 different types of compensation and it is necessary to adjust this parameter 750 1050 1350 Setting Type of compensation Weather compensation ...

Страница 43: ...To activate the DHW connect the storage tank sensor to B3 input see the following electric drawing and select the DHW mode with the operating mode button Off Continuous operation the setpoint being the DHW Frost Protection setpoint 5 C On DHW charging takes place automatically the setpoint being the Nominal DHW setpoint or the Reduced DHW setpoint according to the selected kind of DHW release Setp...

Страница 44: ...following parameter to enable the relay output for the charging pump Q3 Configuration Line Nr Function Adjustment 5892 Relay output QX3 DHW ctrl elem Q3 Default values DHW Line Nr Function Default Value Unit 1610 Nominal setpoint 60 ºC 1612 Reduced setpoint 55 ºC 1614 Nominal setpoint max 65 ºC 1620 Release 24h day 1630 Charging priority None parallel 1640 Legionella function Fixed day 1641 Legion...

Страница 45: ...already charged when space heating is started the release of DHW heating is brought forward 1 hour against the switch on point for space heating 0 5 6 12 16 17 24 h Time program 4 DHW When using this setting a specific time program is available for DHW heating For every weekday a time program with a maximum of 3 on phases can be set During the release time the Nominal DHW setpoint applies outside ...

Страница 46: ... started again This means that the heat source is switched on only if the solar plant was not able to ensure the required Legionella function setpoint within the set period of time Fixed weekday The Legionella function can be activated on a fixed weekday 1642 When using this setting heating up to the Legionella setpoint takes place on the selected weekday independent of previous storage tank tempe...

Страница 47: ...r Boiler control unit Safety 1 if the Delta T in the boiler is higher than the maximum Delta T the power drops by 20 Safety 2 if it overcomes the maximum Delta T 8ºC the boiler operates at the minimum power Safety 3 if it overcomes a higher value the boiler stops and an error message appears on the display E 110 428 Lack of water pressure in the circuit Pressure sensor The boiler stops for safety ...

Страница 48: ...ant to avoid environments with excess of humidity dust and aggressive steams If the boilers room needs to have some building works the boilers should be switched off and protected in order to avoid dust For an easier maintenance it is important to respect the minimum distances indicated by the regulations and the manufacturer s instructions both for one boiler and for several boilers Every part of...

Страница 49: ...s indicated in this manual see table TECHNICAL DATA 17 4 1 Gas pressure higher than 45 mbar Units Boiler model Inertial volume m3 1 CD 70 0 0065 1 CD 85 0 0082 1 CD 105 0 0100 1 CD 120 0 0115 1 CD 175 0 0154 1 CD 200 0 0188 1 CD 250 0 0229 1 CD 325 0 0279 1 CD 375 0 0336 1 CD 450 0 0417 1 CD 550 0 0508 1 CD 650 0 0575 1 CD 750 0 0651 1 CD 850 0 0761 1 CD 950 0 0859 2 CD 325 0 0736 2 CD 375 0 0736 ...

Страница 50: ... 9 It is recommended to take periodical measurements of the water pH after the neutralization treatment when the value measured is lower than 6 5 it is recommended to replenish with the powder In any case the neutralization treatment must be made in conformity with the local autonomic and national laws The neutralization system should be placed at a level of height lower than the boiler condensate...

Страница 51: ...CO2 for Natural Gas it is recommended to adjust CO2 at 8 1 for all the boilers Models Range CO2 for Natural Gas ADI CD 70 to 120 7 3 9 3 ADI CD 120 to 175 7 2 8 7 ADI CD 200 to 250 7 3 8 8 ADI CD 325 to 550 7 6 8 6 ADI CD 850 to 950 7 7 9 0 Flues temperature Flues temp MAXIMUM POWER MINIMUM POWER Average Water temperature High 70ºC Low 40ºC High 70ºC Low 40ºC Flues Temp 70 80ºC 50 60ºC 60 70ºC 40º...

Страница 52: ... collector to each boiler 10 Flues collector we recommend that it has an upward slope up to the vertical section of the chimney min 3 CAUTION Check that no flues are getting outside through the damper 5 Damage may be caused to people It is a responsability of the installation company to check and ensure the proper operation of this matter The manufacturer of the boilers declines any responsability...

Страница 53: ...ding to the values indicated at the beginning of this chapter for a correct and quick adjustment of the boiler combustion The damper is included in the boiler supply For those boilers without built in flue damper this can be added as an optional accessory see second point of this chapter Its opening must be adjusted at the moment of the boiler s commissioning and not varied anymore As a built in p...

Страница 54: ...and boiler draining in accordance with the current regulations A pressure switch whose function is to stop the boiler if the hydraulic pressure is lower than the minimum value An automatic air vent of big capacity installed in the flow pipe or in the higher part of the flow circuit of the installation A filter with a stainless steel mesh of 0 3 mm in the heating return of every boiler A water mete...

Страница 55: ... 58 1 68 2 76 7 ΔT 12ºC m3 h 5 0 6 1 7 5 8 6 11 6 14 2 17 3 21 1 25 4 31 5 38 0 42 9 48 4 56 8 64 0 ΔT 15ºC m3 h 4 0 4 9 6 0 6 9 9 3 11 3 13 8 16 9 20 3 25 2 30 4 34 3 38 7 45 5 51 2 If you have to stop the boiler pump it is required that you stop it with a time delay of 3 to 5 minutes once the boiler has stopped This can be obtained by installing a timer disconnect electrical relay Pressure drop ...

Страница 56: ...0 lit 300 lit 800 lit 1200 lit This inertial volume may be distributed between see system drawings in this document o Water header collectors linked by a by pass not closed or one common water header manifold o Water pipes between header collector and boilers OPTION 1 Boiler cascade for 2 or more boilers managed by the boiler control o Siemens LMS 14 o Similar controller from another trademark wit...

Страница 57: ...g installations with high water contents 2 Characteristics of the refilling water different from the hardness TH indicated in the previous table 3 Frequent refillings of the installation with new water because of drainings water leaks repairing even if the water has a hardness lower than 12ºF 4 When the maximum volume allowed of refilling water is exceeded see table c A mesh filter should be insta...

Страница 58: ...ndary circuit Overpressure safety valve Non vibrations mounts Adjusting water flow valve Water meter Water treatment 30 31 32 33 34 36 37 A B C D E F Controller Thermostat Temperature sensor Pressure switch Manometer Thermometer Filter to separate sludge oxides Flow to heating circuit Return from heating circuit Cold feed Drain Flow to D H W circuit Return from D H W circuit CASCADE COMMUNICATION ...

Страница 59: ...I CD boiler Technical Manual 59 System drawing of heating circuits 15 34 11 10a 11 10a 12 17 13 34 11 10a 34 12 12 34 11 10a 12 13 17 13 17 17 13 10d 10d 15 10d System drawing of one boiler and only D H W ...

Страница 60: ...ADI CD boiler Technical Manual 60 System drawing D H W and heating circuit 11 11 System drawing of an old installation heating circuit 11 ...

Страница 61: ...n with high pressure in the secondary circuit very high building with the boilers room in the ground floor or old installation in very bad conditions heating circuit 11 11 11 11 System drawing of an installation as in the previous case D H W and heating circuit 11 11 ...

Страница 62: ...on plate The gas valves are open the air of the gas installation vented and there are no gas leaks Electrical connections are correct see electrical supply for every model the boiler is electrically supplied The controls are set so as to require heat from the system Instruments required for the start up A manometer to check the combustion chamber pressure drop the gas injectors pressure and the in...

Страница 63: ...as pressure switch 02 Motor fan is activated revolutions increase 03 Start of the pre venting phase 04 Time out control of the fan speed 05 Time of pre ignition 06 Safety time of ignition and ionization control constant 07 Safety time of ignition and ionization control variable 10 Operation in the heating mode 11 Not available phase D H W S operation according to the installation and to the boiler...

Страница 64: ... 3 9 3 ADI CD 120 to 175 7 2 8 7 ADI CD 200 to 250 7 2 8 4 ADI CD 325 to 750 7 3 8 8 ADI CD 850 to 950 7 7 9 0 Remember that these changes must be made by specialized technicians 18 4 1 Combustion adjustment a Once the boiler is operating press the button Selection of heating operation mode for more than 3 seconds b The boiler is now in controller stop mode After that press the button INFO and the...

Страница 65: ...of the gas shut off valve in models ADI CD 105 for the combustion adjustment Detail of the gas shut off valve in models ADI CD 120 950 for the combustion adjustment 1 2 Pa Pg B A 1 First remove the cover and turn the screw inside it 1 Combustion adjustment at the maximum power turn it counter clockwise more gas flow 2 Combustion adjustment at the minimum power turn it clockwise more gas flow First...

Страница 66: ...g one according to the gas used The process is the same if you have to change from natural gas to propane Note Propane option just available for models with power output lower than 550 kW Data for máximum power Model Power output Power input LPG Max LPG Max kW kW m3 h kg h CD 70 70 5 72 7 3 0 6 0 CD 85 85 87 7 3 7 7 2 CD 105 104 107 2 4 5 8 8 CD 120 120 123 5 5 1 10 2 CD 175 161 8 166 0 6 9 13 7 C...

Страница 67: ...aving a distance of 3 cm between them 19 1 Procedure to dismantle the burner Be sure that The boiler general switch is on the OFF position The gas duct to the boiler is closed Take out the frontal casing panel of the boiler and lift the top Once made these steps you can place the control panel in two different positions in order to allow the reading of parameters when you are carrying out the boil...

Страница 68: ...on ignition kit If the gas connection has a two pieces coupling disconnect it Disconnect the two flanges of the gas valve each flange has Allen screws of 4 mm Remove the nuts screws of the flange connecting the fan burner group to the boiler heat exchanger By rotating the assembly motor fan you will find Two gaskets between the boiler heat exchanger and the burner flange Burner flange Gasket betwe...

Страница 69: ...5 1 2 4 5 5 3 5 5 5 4 2 19 2 Position of probes and sensors 1 Water flow temperature sensor 2 Water return temperature sensor 3 Safety overheating thermostat 4 Water pressure sensor 5 Manual air venting their number can vary according to the model ...

Страница 70: ...02 94 65 94 74 94 74 Efficiency ref LCV 100 97 2 96 9 97 0 97 2 97 5 97 7 97 8 97 8 98 0 30 104 6 104 7 104 8 105 0 105 0 104 0 104 7 104 8 104 8 Auxiliary electric consumption Full load normal operation kW 47 8 64 6 134 0 93 3 95 2 131 6 167 4 267 9 435 0 Start up seconds kW 236 0 240 0 255 0 245 0 250 0 261 0 274 0 309 0 435 0 Partial load kW 16 7 17 9 23 9 19 1 19 5 31 1 40 7 64 6 69 0 NOx Full...

Страница 71: ...free of charges within a maximum period of 7 days otherwise the spare parts provided will be invoiced 8 The guarantee just covers the material repairing The guarantee does not cover the expenses for the dismantling of the equipments for the installation and or for the local or premises where they are installed neither for the connections of the new equipments or for additional works necessary to r...

Страница 72: ...ulfilment of the payment conditions established at the moment of the purchase The GUARANTEE does not cover expenses for damage In order to exercise the rights of this guarantee the purchaser must renounce to his own right and submit to the jurisdiction of the courts of Barcelona The guarantee validity excludes any other kind of responsibility for ADISA BY HITECSA HIPLUS AIRE ACONDICIONADO S L Any ...

Страница 73: ...PB short circuit or no bus power supply Check bus connection and components 82 LPB address collision Check devices addresses 83 BSB Wire short circuit or no communication Check room units connection 84 BSB Wire address collision Check room units addresses 85 BSB radio communication fault Check bus connection and components 91 Data loss in EEPROM Internal fault call technical service 98 Extension m...

Страница 74: ...zation error Others Call technical service for diagnostic code 153 Unit manually locked 160 Fan fault 380 Fan speed thershold not reached Faulty fan bad adjustments check connections 164 Flow pressure switch HC fault 562 Check water pressure fill circuit check electric terminal 183 Unit in parameterization mode 260 Flow temperature 3 sensor fault Short circuit or Open circuit flow sensor B14 Check...

Страница 75: ...10 373 Extension module 3 fault Check connection and component 378 Repetition internal Call technical service 382 Repetition speed Call technical service 384 Extraneous light Continuous ionization signal after switch off Check burner and gas valve 385 Mains undervoltage Check electric supply in boiler terminals 386 Fan speed tolerance 384 Check air filter clean burner 432 Function ground not conne...

Страница 76: ...76 HIPLUS AIRE ACONDICIONADO S L Masia Torrents 2 08800 Vilanova i la Geltrú Barcelona Spain Tel 34 93 893 49 12 Fax 34 93 893 96 15 www adisaheating com ...

Отзывы: