5 .  Retain the APU Mini to the wall mounting plate using the single M6  

 

 

 

retaining screw at the top of the wall plate .

6 .  Fit the plastic cover by pressing as indicated below with the palm of the  

 

 

hand until the Dual Lock

TM 

is heard to ‘click’ .

4 .14 

Pipework connections & guidelines: 

1 .  Before connecting the APU Mini to the system ensure that system flushing  

 

 

has been performed correctly and all foreign matter, including pipe scale,  

 

 

has been removed .

 

Note: Foreign material from the system coming into contact with the    

 

 

expansion vessel bladder could cause premature failure of the expansion  

 

 vessel .

2 .  Isolating valves 

MUST be installed on the unit inlet and outlet, before    

 

 

connection to the flexible hoses to allow the unit to be isolated if required .  

 

 

The isolation valve on the outlet should be of a lockshield type .  See  

 

 

 

Fig . 10 .

3 .  A drain valve must be fitted on the outlet of the APU Mini before the    

 

 

isolation valve .  See Fig . 10 .

4 .  The connection to the heating/chilling system is also made with the    

 

 

supplied flexible hose and a 15 mm compression fitting . The hose is  

 

 

 

made water tight with a sealing washer on assembly, nip tight to 4 to    

 

 

5 Nm for water tight seal .  

(Do not overtighten) .

5 .  The connection to the heating/chilling system can be made to the left    

 

 

or right hand side by routing the flexible hose supplied as detailed below .

Fig . 6

Fig . 7

Fig . 9

Fig . 8

Cable tie

Содержание Mini 130

Страница 1: ...Installation and servicing Mini 130 230 Digital Pressurisation Unit...

Страница 2: ...y be operated with the front cover in place z In the interests of electrical safety a 30 mA residual current device R C D not supplied should be installed in the supply circuit This may be part of a c...

Страница 3: ...unit Do not secure pipework to the APU Mini this will cause damage and possible leakage 1 17 Flux Solder joints must be completed and flux residues removed prior to APU Mini installation flux damage...

Страница 4: ...ted to avoid electrics or areas sensitive to water damage As part of the AB airgap CAT 5 fluid isolation the APU Mini has a weir type overflow on the front water will be discharged from this area in t...

Страница 5: ...ached if the unit is a twin pump model the pumps run in duty standby mode the controller will alternate which pump starts first to even the wear on the pumps The manifold is fitted with a non return v...

Страница 6: ...xpansion vessel 2 Isolating valves MUST be installed on the unit inlet and outlet before connection to the flexible hoses to allow the unit to be isolated if required The isolation valve on the outlet...

Страница 7: ...th the current national electrical regulations and installed by a qualified person 5 12 Safety In the interests of electrical safety a 30 mA residual current device R C D not supplied should be instal...

Страница 8: ...olt free contact specifically assigned for boiler chiller shut down in the event that the APU Mini detects system pressure above the Hi alarm pressure or below the Lo alarm pressure The boiler interlo...

Страница 9: ...on correctly the following conditions must be met If these conditions have not been met the commissioning process should not continue z Ensure the system connection has been made into the heating chil...

Страница 10: ...owly flash See Fig 20 3 Using buttons B C select the P function required 4 Press button A to enter the function 5 Using buttons B C increment the value required up and down 6 Press button A to confirm...

Страница 11: ...ADEY Customer Service team on 44 0 1242 546717 Our staff are trained to help and advise you over the phone 7 OPERATION 7 11 Normal operation The Home screen will display the status of the system pres...

Страница 12: ...d period of maintainance the following steps should be taken 1 Inspect the APU Mini for signs of damage 2 Check APU Mini tank for debris remove debris and clean tank if needed Debris may cause damage...

Страница 13: ...ove pressure from the APU outlet and verify the displayed pressure is 0 bar Error will be displayed if the sensor signal is outside parameters Replace sensor call ADEY Sensor failure error Sensor erro...

Страница 14: ...leakage Test pump operation Float valve operation x Level probe operation x Water condition x Exp vessel pre charge x Comments Service No 2 Date Engineer name Company name Tel No System pressure bar D...

Страница 15: ...ed Kingdom Object of the declaration Pressurisation Unit The object of the declaration described above is in conformity with the relevant Union harmonisation legislation Machinery Directive 2006 42 EU...

Страница 16: ...30 31...

Страница 17: ...nfo adey com www adey com Produced from recycled material A carbon neutral company All ADEY marks are trademarks of Adey Holdings 2008 Limited Please visit adey com trademarks for a list of ADEY marks...

Отзывы: