Adey Mini 130 Скачать руководство пользователя страница 7

- 12 -

- 13 -

6 .  The flexible hose and any wiring can be retained in the desired position  

 

 

using cable ties and the two metal cable retention points on the top left  

 

 

and right of the APU tank .  See Figs . 8 & 9 .

7 .  The warning pipe should be connected to a suitable drain via a tundish   

 

 

enabling visual warning of an overflow condition . The overflow fitting is  

 

 

designed to use 19 to 23 mm diameter plastic waste pipe or connect to   

 

 

G ¾ threaded pipe . Ensure there is a demountable joint in the pipe to    

 

 

allow the removal of the APU Mini if needed . 

8 .  Non-return valves, pressure reducing valves and RPZ valves 

MUST NOT  

 

 

be installed between the APU Mini and the heating/cooling system . These  

 

 

devices will prevent the pressure sensor from reading the system pressure  

 

 

and will lead to incorrect operation of the unit .

9 .  The APU Mini should be connected to the system return header along with  

 

 

the expansion vessels as specified in BS 7074 .  See Fig . 10 .

4 .15 

Typical installation diagram: 

4 .16 

Vessel sizing & location: 

1 .  System expansion vessel sizing should comply with the BS 7074 Expansion  

 

 

Vessel sizing calculation .

2 .  The pressurisation unit and expansion vessels should be connected to the  

 

 

system at the same point, to provide a neutral pressure reading .

3 .  A lockshield valve and drain valve should be installed at the inlet of each  

 

 

expansion vessel to allow for servicing .  

5  ELECTRICAL INSTALLATION / EARTHING

5 .11

 Regulations: The electrical installation must be carried out in    

 

 

 

accordance with the current national electrical regulations and    

 

 

installed by a qualified person .

5 .12

   Safety: In the interests of electrical safety a 30 mA residual current  

 

  

 

device (

R.C.D. not supplied) should be installed in the supply circuit .  

 

  

 

This may be part of a consumer unit or a separate unit .

5 .13  Before starting work on the electrical supply ensure power supply is 

 

  

 isolated .

5 .14

  DO NOT allow the supply cord to contact hot surfaces, including the  

 

  

 

motor shell, pump body or pipework .  The cord should be safely   

 

 

 

routed and secured by cable clips .

5 .15

  Adjacent pipes: Adjacent suction and delivery pipes should be fitted with    

 

 

earthing clamps in accordance with current regulations (Fig . 12) .

5 .16

 Earthing: This appliance must be earthed via the supply cord .

5 .17 

Pipework:  Copper or metallic pipework must have supplementary earth    

 

 

bonding where the continuity has been broken by flexible hoses or plastic    

 

 components .

5 .18

  Additional earthing: Certain installations may require additional earthing    

 

 

arrangements such as equipotential bonding . Reference should be made to  

 

 

the relevant regulations concerning this subject to ensure compliance .

5 .19

 Connections: The APU Mini must be connected to a dedicated fused SPUR via  

 

 

a lockable isolator to avoid authorized disconnection .

5 .20  The electrical connection 

must be made adjacent to (not behind) the APU   

 

 

Mini to allow disconnection of the electrical supply should the pump module need to  

 

be removed for service or maintenance .

Fig . 10

Fig . 11

APU Mini

Warning pipe

Drain 

valve

Isolation valves

Expansion 

vessel

Return 

header

Lockshield 

valve

Drain valve

Earth continuity 

connection

Fig . 12

Flexible 

hose

Metallic 

pipework

Metallic 

pipework

Содержание Mini 130

Страница 1: ...Installation and servicing Mini 130 230 Digital Pressurisation Unit...

Страница 2: ...y be operated with the front cover in place z In the interests of electrical safety a 30 mA residual current device R C D not supplied should be installed in the supply circuit This may be part of a c...

Страница 3: ...unit Do not secure pipework to the APU Mini this will cause damage and possible leakage 1 17 Flux Solder joints must be completed and flux residues removed prior to APU Mini installation flux damage...

Страница 4: ...ted to avoid electrics or areas sensitive to water damage As part of the AB airgap CAT 5 fluid isolation the APU Mini has a weir type overflow on the front water will be discharged from this area in t...

Страница 5: ...ached if the unit is a twin pump model the pumps run in duty standby mode the controller will alternate which pump starts first to even the wear on the pumps The manifold is fitted with a non return v...

Страница 6: ...xpansion vessel 2 Isolating valves MUST be installed on the unit inlet and outlet before connection to the flexible hoses to allow the unit to be isolated if required The isolation valve on the outlet...

Страница 7: ...th the current national electrical regulations and installed by a qualified person 5 12 Safety In the interests of electrical safety a 30 mA residual current device R C D not supplied should be instal...

Страница 8: ...olt free contact specifically assigned for boiler chiller shut down in the event that the APU Mini detects system pressure above the Hi alarm pressure or below the Lo alarm pressure The boiler interlo...

Страница 9: ...on correctly the following conditions must be met If these conditions have not been met the commissioning process should not continue z Ensure the system connection has been made into the heating chil...

Страница 10: ...owly flash See Fig 20 3 Using buttons B C select the P function required 4 Press button A to enter the function 5 Using buttons B C increment the value required up and down 6 Press button A to confirm...

Страница 11: ...ADEY Customer Service team on 44 0 1242 546717 Our staff are trained to help and advise you over the phone 7 OPERATION 7 11 Normal operation The Home screen will display the status of the system pres...

Страница 12: ...d period of maintainance the following steps should be taken 1 Inspect the APU Mini for signs of damage 2 Check APU Mini tank for debris remove debris and clean tank if needed Debris may cause damage...

Страница 13: ...ove pressure from the APU outlet and verify the displayed pressure is 0 bar Error will be displayed if the sensor signal is outside parameters Replace sensor call ADEY Sensor failure error Sensor erro...

Страница 14: ...leakage Test pump operation Float valve operation x Level probe operation x Water condition x Exp vessel pre charge x Comments Service No 2 Date Engineer name Company name Tel No System pressure bar D...

Страница 15: ...ed Kingdom Object of the declaration Pressurisation Unit The object of the declaration described above is in conformity with the relevant Union harmonisation legislation Machinery Directive 2006 42 EU...

Страница 16: ...30 31...

Страница 17: ...nfo adey com www adey com Produced from recycled material A carbon neutral company All ADEY marks are trademarks of Adey Holdings 2008 Limited Please visit adey com trademarks for a list of ADEY marks...

Отзывы: