10
Installation
Commissioning
1.
Before leaving the new installation;
a.
Check the following functions in accordance with the operating instructions specified in the
‘Operation’ section of this manual.
Turning 'Off' the Main Burner.
Electrical battery installation
Light the Main Burner.
b.
Ensure that the operator has been instructed in the areas of correct lighting, operation, and
shutdown procedure for the appliance.
2.
This manual must be kept by the owner for future reference and a record of the Date of Purchase, Date
of Installation and the Serial Number of the Appliance must be recorded and kept with this manual.
(These details can be found on the Rating label, refer to the ‘Gas Connection’ section).
NOTE:
If for some reason it is not possible to get the appliance to operate correctly, shut off the gas supply
and contact the supplier of this appliance.
Содержание EGG-16S
Страница 2: ......
Страница 8: ...5 Dimensions EGG 48S EGG 36S EGG 24S EGG 16S...
Страница 21: ...18 Explosion Drawing EGG 48S...