(c) If overheating or unusual noises are produced, stop the machine
immediately to check for lack of' ]uhrication, faulty adjustments,
dull tool bits or other deficiencies, correct any problems
before resuming work.
(d) Keep the work area clean.
3.Weekly maintenance
(a) Clean and coat the lead screw with oil.
(b) Check the lubrication of the sliding parts of the table. apply
light greese if needed.
4. Monthly maintenance
(a) Adjust the accuracy of the slides on both the cross and
longitudinal feeding.
(b) Lubricate the bearings, worm gear and worm shaft with light
grease.
5. Yearly maintenance
(a) Adjust the table to assure that it is level in all directions.
(b) Check the electrical cord, plug, circuit breakers and related
connections to assure that they are secure and safe.
(c) Drain the lubricant from the gear box and replace it.
12
Содержание ZAY7045FG
Страница 14: ...4 I SPINDLE ASSEMBLV 1 l I...
Страница 16: ...TABLE ASSEMBLY i 9...