![ADC Soneplex Soneplex Fiber Hub Cabinet SPX-CABFIN04 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/adc/soneplex-soneplex-fiber-hub-cabinet-spx-cabfin04/soneplex-soneplex-fiber-hub-cabinet-spx-cabfin04_user-manual_2848187019.webp)
LTPS-UM-8007-01, Issue 1
Prior to Installing the SPX-CABFIN
SPX-CABFIN01, SPX-CABFIN04
November 9, 2001
7
P
REPARING
THE
F
ORM
1
Place the conduits, cables, ground rod(s), and ground wire(s) as indicated in the engineering work prints.
Position the conduits horizontally to accommodate four 4-inch conduits. If fewer than four conduits are used,
install those closest to the center of the template first.
2
Place a ring ground system around the proposed foundation pad location according to local practices and
building safety codes.
3
Lay the SPX-CABFIN cabinet template on the ground over the conduits, and slip the conduits (or cables) into
the hole(s) for the cable entry box(es) to locate their positions.
4
Construct the concrete form as shown in
Refer to the template label for dimensions.
5
Lay the power transfer cabinet template (if used) over the conduits, in one corner of the pad, to locate the
corner as shown in
Refer to the template label.
Figure 4.
Foundation Pad Preparation
Template
18"
(457 mm)
52"
(1321 mm)
132"
(3353 mm)
146"
(3708 mm)
Содержание Soneplex Soneplex Fiber Hub Cabinet SPX-CABFIN04
Страница 1: ...Soneplex Soneplex USER MANUAL Soneplex Fiber Hub Cabinet Product Catalog SPX CABFIN01 SPX CABFIN04...
Страница 6: ...Cautions and Warnings LTPS UM 8007 01 Issue 1 vi November 9 2001 SPX CABFIN01 SPX CABFIN04...
Страница 12: ...List of Tables LTPS UM 8007 01 Issue 1 xii November 9 2001 SPX CABFIN01 SPX CABFIN04...
Страница 29: ......
Страница 82: ...Appendix B Product Support LTPS UM 8007 01 Issue 1 70 November 9 2001 SPX CABFIN01 SPX CABFIN04...