Note
Refer to
figure.
Figure 19: LED board assembly (Optical assembly)
3. Disconnect the LED leads from the PCB and remove and discard the existing LED Optical Assembly.
Refer to the
figure.
4. Install the new LED Optical Assembly (purchased as a complete assembly) and torque screws to 2.5 Nm.
Re-connect the LED lead to the terminal on the PCB.
UM-5073, Rev. 1.0, 2021/07/13
37
Copyright
©
ADB SAFEGATE, All Rights Reserved
Содержание RELIANCE Omni 1-Dome
Страница 1: ...RELIANCE Omni 1 Dome 8 inch User Manual UM 5073 Rev 1 0 2021 07 13 ...
Страница 2: ......
Страница 8: ...RELIANCE Omni 1 Dome List of Figures viii Copyright ADB SAFEGATE All Rights Reserved ...
Страница 10: ...RELIANCE Omni 1 Dome List of Tables x Copyright ADB SAFEGATE All Rights Reserved ...
Страница 20: ...RELIANCE Omni 1 Dome General Information 10 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 26: ...RELIANCE Omni 1 Dome Installation 16 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 28: ...RELIANCE Omni 1 Dome Operation 18 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 52: ...RELIANCE Omni 1 Dome Maintenance 42 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 54: ...RELIANCE Omni 1 Dome Troubleshooting 44 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 60: ...RELIANCE Omni 1 Dome POWER TABLE 50 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 62: ...RELIANCE Omni 1 Dome CABLE LOSS 52 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 66: ......