![Ada GroundDrill-12 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/ada/grounddrill-12/grounddrill-12_operating-manual_2845683008.webp)
MEASUREMENT FOUNDATION
Ground
Drill - 12
Drill - 12
8
FUEL
1. Remove the fuel tank cap and check fuel lever. If necessary add some fuel.
2. Use only motor gasoline (with a minimum of 92 octane or unleaded or low leaded gasoline). Never use mixture of oil-fuel or sour
gasoline. Avoid getting dirt or water in the fuel tank.
STARTING ENGINE
1. Turn main switch to ON
2. Move choke lever to the position “4” for cold starts to block air low to carburetor
3. Pump primer ball near the air ilter several times
4. Grasp handle of pull start chord and pull quickly
5. Move choke lever to the position “2” when the engine warms.
6. Operation
1. Let engine warm for at least 1 min.
2. Press or release throttle lever to get desired rpms. If the engine reduce rpms on load,
adjust the position of throttle lever.
Important!
Do not work without workmate. Otherwise it can lead to the damages.
Avoid running at high rpms for long periods. The unit needs time for lubricant to get to
all internal parts.
Do not run the motor at high rpms without load.
Position of choke lever:
1. Stop
2. Idling
3. Fast
4. High rpm
Содержание GroundDrill-12
Страница 1: ...Operating manual Ground drill Model GroundDrill 12 Manufacturer Address WWW ADAINSTRUMENTS COM...
Страница 17: ...Ground Drill 12 ADAINSTRUMENTS WWW ADAINSTRUMENTS COM...
Страница 18: ...GroundDrill 12 Drill 12 1 19 2 19 3 21 4 22 5 22 6 25 7 25 8 25 9 29 10 30 11 30 1 2...
Страница 19: ...MEASUREMENT FOUNDATION 19 GroundDrill 12 1 Ground Drill 12 2...
Страница 20: ...MEASUREMENT FOUNDATION GroundDrill 12 Drill 12 5 2 3...
Страница 21: ...MEASUREMENT FOUNDATION 21 GroundDrill 12 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3...
Страница 22: ...MEASUREMENT FOUNDATION 22 GroundDrill 12 Drill 12 4 4 159 3 92 TCI 5 5 3600 1 0 0 6 7 5 2800 23 5 5 2...
Страница 23: ...MEASUREMENT FOUNDATION 23 GroundDrill 12 1 2 3 4 5 SAE 10W 30 SAE Synthetic 5W 30 30 10W 30 5W 30...
Страница 24: ...MEASUREMENT FOUNDATION 2 GroundDrill 12 Drill 12 1 2 3 1 2 92 1 ON 2 4 3 4 5 2 1 2 3 4...
Страница 25: ...MEASUREMENT FOUNDATION 25 GroundDrill 12 6 1 1 2 7 1 2 OFF 8...
Страница 26: ...MEASUREMENT FOUNDATION 26 GroundDrill 12 Drill 12 5 25 50 100 2 1 2 25...
Страница 27: ...MEASUREMENT FOUNDATION 27 GroundDrill 12 1 2 3 4 5...
Страница 28: ...MEASUREMENT FOUNDATION 28 GroundDrill 12 Drill 12 1 2 F7RTC 1 2 3 4 0 70 0 80...
Страница 29: ...MEASUREMENT FOUNDATION 29 GroundDrill 12 5 1 2 1 8 1 4 9 1 2 3 4 5 2 3 6 7...
Страница 30: ...MEASUREMENT FOUNDATION 30 GroundDrill 12 1...
Страница 31: ...1 2 3 4 5 6 7 8 9 WWW ADAINSTRUMENTS COM info adainstruments com...
Страница 34: ...ADA MEASUREMENT FOUNDATION WWW ADAINSTRUMENTS COM...