![Ada GroundDrill-12 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/ada/grounddrill-12/grounddrill-12_operating-manual_2845683004.webp)
MEASUREMENT FOUNDATION
Ground
Drill - 12
Drill - 12
CHECK BEFORE START-UP
Check all bolts and nuts are securely tight. Tighten where necessary.
Check the cutting blades to avoid chipping, cracking or bending. NEVER use a drill when damaged.
CAUTIONS DURING USAGE
Do not allow other persons within 5 meters of the worksite. IT IS DANGEROUS for pets and children to be near the equipment
when operating.
Be careful when drilling through rocky ground. This equipment may rotate in reverse and damage.
Work only in a stable position.
Be sure to stop the engine before allowing persons to approach within 5 m of the equipment.
Do not allow children or anyone who is unskilled in equipment usage to operate the equipment.
Never touch the drill bit when the engine is running. Be sure the engine is off and the drill has stopped rotating before handling.
Beware of the rotating drill bit.
Be sure the drill bit has stopped moving before placing on the ground.
When deep drilling, do not attempt to complete work in one stretch. Extract soil in 2 or 3 steps.
Before servicing the auger or making repairs, always stop the engine, remove the plug cap from the spark plug and allow the engine
to cool down.
Before storing the auger drain all remaining fuel and wipe the equipment clean of dirt and debris.
NEVER store the auger near live lames.
Содержание GroundDrill-12
Страница 1: ...Operating manual Ground drill Model GroundDrill 12 Manufacturer Address WWW ADAINSTRUMENTS COM...
Страница 17: ...Ground Drill 12 ADAINSTRUMENTS WWW ADAINSTRUMENTS COM...
Страница 18: ...GroundDrill 12 Drill 12 1 19 2 19 3 21 4 22 5 22 6 25 7 25 8 25 9 29 10 30 11 30 1 2...
Страница 19: ...MEASUREMENT FOUNDATION 19 GroundDrill 12 1 Ground Drill 12 2...
Страница 20: ...MEASUREMENT FOUNDATION GroundDrill 12 Drill 12 5 2 3...
Страница 21: ...MEASUREMENT FOUNDATION 21 GroundDrill 12 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3...
Страница 22: ...MEASUREMENT FOUNDATION 22 GroundDrill 12 Drill 12 4 4 159 3 92 TCI 5 5 3600 1 0 0 6 7 5 2800 23 5 5 2...
Страница 23: ...MEASUREMENT FOUNDATION 23 GroundDrill 12 1 2 3 4 5 SAE 10W 30 SAE Synthetic 5W 30 30 10W 30 5W 30...
Страница 24: ...MEASUREMENT FOUNDATION 2 GroundDrill 12 Drill 12 1 2 3 1 2 92 1 ON 2 4 3 4 5 2 1 2 3 4...
Страница 25: ...MEASUREMENT FOUNDATION 25 GroundDrill 12 6 1 1 2 7 1 2 OFF 8...
Страница 26: ...MEASUREMENT FOUNDATION 26 GroundDrill 12 Drill 12 5 25 50 100 2 1 2 25...
Страница 27: ...MEASUREMENT FOUNDATION 27 GroundDrill 12 1 2 3 4 5...
Страница 28: ...MEASUREMENT FOUNDATION 28 GroundDrill 12 Drill 12 1 2 F7RTC 1 2 3 4 0 70 0 80...
Страница 29: ...MEASUREMENT FOUNDATION 29 GroundDrill 12 5 1 2 1 8 1 4 9 1 2 3 4 5 2 3 6 7...
Страница 30: ...MEASUREMENT FOUNDATION 30 GroundDrill 12 1...
Страница 31: ...1 2 3 4 5 6 7 8 9 WWW ADAINSTRUMENTS COM info adainstruments com...
Страница 34: ...ADA MEASUREMENT FOUNDATION WWW ADAINSTRUMENTS COM...