![Ada GroundDrill-12 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/ada/grounddrill-12/grounddrill-12_operating-manual_2845683003.webp)
Drill - 12
MEASUREMENT FOUNDATION
Ground
Drill - 12
Drill - 12
3
1. Introduction
Power auger Ground Drill 12 is used for work with two operators. During operation seizure of the auger may occur and the equip
-
ment may rotate in reverse. That’s why both operators must be very careful during operation and know and follow all precautions
and possible risks. Return stroke is partly reduced by the power auger structure. You should know how to use the instrument to avoid
damages.
2. Precautions
Wear a long-sleeved shirt and long pants closed at the cuff.
Do not wear neck-tie or other loosely danging garments. Such articles may become entangled in the drill when working.
Wear protective goggles.
Wear helmet when working.
Wear work shoes equipped with no-slip tread.
Wear ear plugs to protect the ear drum from noise.
Do not work for long periods of time in summer and winter. Take breaks frequently.
Do not use the auger in the rain. The possibility of your slipping is increased when the ground is wet.
Do not use the auger indoors or in poorly ventilated places.
Do not smoke in the vicinity of the auger. This equipment runs on gasoline. Keep the equipment from lames and sparks.
Do not remove the gas cap or refuel while the engine is running or hot.
Wipe the auger body of any spilled gasoline after refueling.
Store fuel in approved containers and keep in a cool place.
Содержание GroundDrill-12
Страница 1: ...Operating manual Ground drill Model GroundDrill 12 Manufacturer Address WWW ADAINSTRUMENTS COM...
Страница 17: ...Ground Drill 12 ADAINSTRUMENTS WWW ADAINSTRUMENTS COM...
Страница 18: ...GroundDrill 12 Drill 12 1 19 2 19 3 21 4 22 5 22 6 25 7 25 8 25 9 29 10 30 11 30 1 2...
Страница 19: ...MEASUREMENT FOUNDATION 19 GroundDrill 12 1 Ground Drill 12 2...
Страница 20: ...MEASUREMENT FOUNDATION GroundDrill 12 Drill 12 5 2 3...
Страница 21: ...MEASUREMENT FOUNDATION 21 GroundDrill 12 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3...
Страница 22: ...MEASUREMENT FOUNDATION 22 GroundDrill 12 Drill 12 4 4 159 3 92 TCI 5 5 3600 1 0 0 6 7 5 2800 23 5 5 2...
Страница 23: ...MEASUREMENT FOUNDATION 23 GroundDrill 12 1 2 3 4 5 SAE 10W 30 SAE Synthetic 5W 30 30 10W 30 5W 30...
Страница 24: ...MEASUREMENT FOUNDATION 2 GroundDrill 12 Drill 12 1 2 3 1 2 92 1 ON 2 4 3 4 5 2 1 2 3 4...
Страница 25: ...MEASUREMENT FOUNDATION 25 GroundDrill 12 6 1 1 2 7 1 2 OFF 8...
Страница 26: ...MEASUREMENT FOUNDATION 26 GroundDrill 12 Drill 12 5 25 50 100 2 1 2 25...
Страница 27: ...MEASUREMENT FOUNDATION 27 GroundDrill 12 1 2 3 4 5...
Страница 28: ...MEASUREMENT FOUNDATION 28 GroundDrill 12 Drill 12 1 2 F7RTC 1 2 3 4 0 70 0 80...
Страница 29: ...MEASUREMENT FOUNDATION 29 GroundDrill 12 5 1 2 1 8 1 4 9 1 2 3 4 5 2 3 6 7...
Страница 30: ...MEASUREMENT FOUNDATION 30 GroundDrill 12 1...
Страница 31: ...1 2 3 4 5 6 7 8 9 WWW ADAINSTRUMENTS COM info adainstruments com...
Страница 34: ...ADA MEASUREMENT FOUNDATION WWW ADAINSTRUMENTS COM...