background image

4

6

2

Manufacturing Inc.

ACL

ACL 2000 FLAME FAIL IGNITION SYSTEM

Principle of 
Operation

The ACL 2000 safely provides pilot ignition and ensures flame fail protection 
through a high temperature thermocouple and CSA approved gas valve.  By 
pushing the gas valve button, fuel gas is released and ignited by the spark 
generated at the pilot nozzle tip by the piezo (ignitor) button.  With the pilot 
flame present, the thermocouple is energized by the produced heat, which 
holds the gas valve in the open position and allows flow of fuel gas.  When the 
pilot flame is not present, the thermocouple de-energizes by cooling, effectively 
closing the gas valve.  The pilot flame may be field adjusted by the built-in 
needle valve to achieve optimal performance.

The recommended mounting location of the ACL 2000 is from one side of the 
burner at a 45 degree angle through a 1” connection (either a collar or a union).  
If a 1” nipple is used for proper positioning, schedule 40 piping is 
recommended.

Pilot nozzle tip 

must not 

extend past the burner into the main flame.

A clean, steady dry fuel gas supply (25 PSI max.) is required for reliable 
operation.  When only wet gas is available, it is recommended that a coalescing 
filter be installed before the gas leaves the heated building or directly after the 
filter regulator.

Purge air and debris from lines prior to operating ACL 2000.

The gas valve has been factory tested/set for use with a 20 PSI fuel supply and 
should require no adjustment.  If necessary, fine tuning is possible after ignition.

Thermocouple operation may be affected if pilot flame is too large (flame lift-off 
may occur) or too small (not enough heat) - both conditions will not allow the 
gas valve to open.

1. Push and hold gas valve button.

2. While pressing gas valve button, push piezo (ignitor) button.

3. Release gas valve button after 20 seconds (or until thermocouple has
    heated enough to hold gas valve open)

4. Confirm gas valve is open by pressure reading on output gauge.

5. Repeat procedure if pilot does not light.          

         

Installation and 
Start-up

Operating 
Instructions

Содержание 2000

Страница 1: ...2000 FLAME FAIL IGNITION SYSTEM WARNING ACL is not responsible for the misuse or incorrect application of this product This manual must be read in its entirety before installation of this system Installation must be performed by a qualified technician and must adhere to the standards set by the local regulatory authorities ACL 2000 FLAME FAIL IGNITION MANUAL ...

Страница 2: ...4 6 Manufacturing Inc ACL ACL 2000 FLAME FAIL IGNITION SYSTEM ...

Страница 3: ...m control capabilities Application The ACL 2000 Flame Fail Ignition System provides safe and reliable ignition flame recognition for all types of gas fired heating appliances including line heaters reboilers dehydrators and treaters Economically priced and easy to install the ACL 2000 mounts into position through a 1 NPT collar eliminating unnecessary welding and installation of expensive latching...

Страница 4: ...per positioning schedule 40 piping is recommended Pilot nozzle tip must not extend past the burner into the main flame A clean steady dry fuel gas supply 25 PSI max is required for reliable operation When only wet gas is available it is recommended that a coalescing filter be installed before the gas leaves the heated building or directly after the filter regulator Purge air and debris from lines ...

Страница 5: ...IGNITION SYSTEM ACL 2000 and ACL High Efficiency Burner installed on boil off tank ACL2000 Main Burner Temp Control Valve Safety Shutdown Valve Main Burner Regulator Supply Pilot Regulator Supply 20 25 psi Supply Output Manual Shut Off Valve Optional Low level Shutdown ...

Страница 6: ...10 15 20 25 30 Replacing Pilot Ignitor Tube 12 1 Remove cap screws 8 loosen housing set screw 10 and slide aluminum housing 1 Down the pilot ignitor tube 12 2 Disconnect lead wire from piezo button 4 and disconnect thermocouple from gas valve button 2 3 Disconnect the pilot line from pilot valve assembly 3 4 Slide pilot ignitor tube 12 through the aluminum housing 1 and replace with new pilot igni...

Страница 7: ..._____________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ __________________________________________________________...

Страница 8: ...product which is found to be defective in such workmanship or material will be repaired or replaced by Seller for a period of one year from purchase date Warranty of such items do not include shipping installation or set up Liability Statement ACL Manufacturing Inc Shall not be liable for any special indirect consequential or other damages of a like general nature including without limitation loss...

Отзывы: