background image

4

6

4

Manufacturing Inc.

ACL

ACL 2000 FLAME FAIL IGNITION SYSTEM

#3 Pilot Valve Assy

#5 Supply Gauge

#5 Output Gauge

#8 Cap Screw

#4 Piezo Button

#2 Baso Valve Assy

#7 SST Nipple

#1 Aluminum 
Housing

#11 O-ring

#6 SST Tee

#12-22 Pilot 
Ignitor Tube

#9 Pilot Nozzle

#10 Housing 
Set Screw

Pilot Nozzle 
Set Screw

L Dimension

kPa

psi

50

100

150

200

5

10

15

20

25

30

kPa

psi

50

100

150

200

5

10

15

20

25

30

Replacing Pilot Ignitor Tube (#12)

1. Remove cap screws (#8), loosen housing set screw (#10), and slide aluminum housing (#1) 
Down the pilot ignitor tube (#12)

2. Disconnect lead wire from piezo button (#4) and disconnect thermocouple from gas valve     
button (#2)

3. Disconnect the pilot line from pilot valve assembly (#3)

4. Slide pilot ignitor tube (#12) through the aluminum housing (#1) and replace with new pilot 
ignitor tube

5. Reconnect pilot line, thermocouple, and piezo button

6. Slide housing back together and tighten cap screws and housing set screw

ACL 2000 FLAME FAIL IGNITION SYSTEM

Содержание 2000

Страница 1: ...2000 FLAME FAIL IGNITION SYSTEM WARNING ACL is not responsible for the misuse or incorrect application of this product This manual must be read in its entirety before installation of this system Installation must be performed by a qualified technician and must adhere to the standards set by the local regulatory authorities ACL 2000 FLAME FAIL IGNITION MANUAL ...

Страница 2: ...4 6 Manufacturing Inc ACL ACL 2000 FLAME FAIL IGNITION SYSTEM ...

Страница 3: ...m control capabilities Application The ACL 2000 Flame Fail Ignition System provides safe and reliable ignition flame recognition for all types of gas fired heating appliances including line heaters reboilers dehydrators and treaters Economically priced and easy to install the ACL 2000 mounts into position through a 1 NPT collar eliminating unnecessary welding and installation of expensive latching...

Страница 4: ...per positioning schedule 40 piping is recommended Pilot nozzle tip must not extend past the burner into the main flame A clean steady dry fuel gas supply 25 PSI max is required for reliable operation When only wet gas is available it is recommended that a coalescing filter be installed before the gas leaves the heated building or directly after the filter regulator Purge air and debris from lines ...

Страница 5: ...IGNITION SYSTEM ACL 2000 and ACL High Efficiency Burner installed on boil off tank ACL2000 Main Burner Temp Control Valve Safety Shutdown Valve Main Burner Regulator Supply Pilot Regulator Supply 20 25 psi Supply Output Manual Shut Off Valve Optional Low level Shutdown ...

Страница 6: ...10 15 20 25 30 Replacing Pilot Ignitor Tube 12 1 Remove cap screws 8 loosen housing set screw 10 and slide aluminum housing 1 Down the pilot ignitor tube 12 2 Disconnect lead wire from piezo button 4 and disconnect thermocouple from gas valve button 2 3 Disconnect the pilot line from pilot valve assembly 3 4 Slide pilot ignitor tube 12 through the aluminum housing 1 and replace with new pilot igni...

Страница 7: ..._____________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ _____________________________________________________________________ __________________________________________________________...

Страница 8: ...product which is found to be defective in such workmanship or material will be repaired or replaced by Seller for a period of one year from purchase date Warranty of such items do not include shipping installation or set up Liability Statement ACL Manufacturing Inc Shall not be liable for any special indirect consequential or other damages of a like general nature including without limitation loss...

Отзывы: