THINGS TO CHECK BEFORE GETTING STARTED
The circuit breaker is the appropriate size and type for the equipment
being installed. Refer to the label on the outdoor unit for specifications.
The circuit breaker is in the off position before attempting to install the
system. Power to the equipment should never be live while attempting to
install or adjusting the system.
The Gray and Blue refrigerant caps are intact on the
indoor unit, outdoor unit and line set connections.
If caps are missing,
please stop and contact us
immediately.
UNBOXING THE EQUIPMENT
INDOOR SECTION
When unboxing the indoor section, make sure to check for any physical
damage to the air handler. Also make sure the connection cable is intact
and physically connected to the air handler.
If the air handler section is damaged or the connection cable is
disconnected/missing,
please stop immediately and give us a call.
IMPORTANT
BEFORE THROWING AWAY THE BOX, BE SURE TO REMOVE THE
CARDBOARD TEMPLATE FOR SECURING THE AIR HANDLER TO THE
WALL. WITHOUT THE TEMPLATE INSTALLATION WILL BE MORE
DIFFICULT.
1.
2.
3.
Содержание ACIQ-12W-EZ115
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 17: ...DIAGRAM FOR PREVIOUS PAGE ...