
– 30 –
C R O S S C O U N T R Y T R I P L E W A L L S E R I E S • G R E E N H O U S E I N S T R U C T I O N S
14. END WALLS
Start off the same way as the sidewalls and roof panels – peel
back the protective coating, mark the corner with a marker
so you know which side is out. Apply foil tape, ventilated for
the bottom / solid for the top
(you can do all the panels before
hand or 1 at a time)
.
Start with a corner first and work towards the centre. Put
aluminum “ ” on the bottom of panels
(drop in 2 seting
blocks)
. There is no aluminum “ ” on the top of the sheets
with the exception of the 2 panels
beside
the door.
After the polycarbonate
panels have been installed,
take the round foam and
fill the space between the
panels and the aluminum
8
9
11
10
5
7
6
1
3
2
4
Содержание Cross Country Arctic Series
Страница 1: ...ACF Greenhouses ...