Accurex Grease Grabber H2O XGH2O Скачать руководство пользователя страница 9

9

Model XGH2O

NOTE

For hoods with fire dampers in the exhaust and 
supply duct collars, an access panel for cleaning 
and inspection shall be provided in the duct. This 
panel shall be as close to the hood as possible but 
should not exceed 18 in. (45.72 cm).

SUPPLY PLENUM SHELL

HOOD FRONT

HANGING CLIP

2.120

1.000

147.0°

57.4°

1.000

1.000

Form Down 147°

Form Up 57

°

1.375

2.125

1.000

3.000

0.563

0.563

0.750

0.750

4.500

.500 x .375 

SLOT (3 PLACES)

0.625

1.500

0.625

Supply Plenum Clip

Installing External Supply Plenums

Using the Supply Plenum Clip - Option #1

1.  Bolt the hanging clip to the supply plenum. Two 

clips are needed for plenums less than 96 in. 
(243.84 cm) long and three for plenums greater 
than 96 in. (243.84 cm). The 
third clip is located in the 
center of the plenum length. 
If there is a utility cabinet, 
the hanging clip should be 
23.5 in. (59.69 cm) from the 
end to the hood.

2.  Using the c-clamps provided, clamp the supply 

plenum hanging clip to the hood standing seam. 
Option: Drill and bolt a 1/4-20 SS bolt through the 
clip and hood standing seam.

NOTE

The supply plenum is provided with plenum clips 
that assist in hanging the plenum. The plenum 
should not be hung only with the plenum clips; 
threaded rod or uni-strut must also be used.

Ductwork

Exhaust

As specified in NFPA 96, Ch. 7.5 (latest edition), 
exhaust duct systems must be constructed in the 
following manner:

Materials:

  Ducts shall be constructed of and 

supported by carbon steel not less than 1.37 mm 
(0.054 in.) (No. 16 MSG) in thickness or stainless steel 
not less than 1.09 mm (0.043 in.) (No. 18 MSG) 
in thickness.

Installation:

  All seams, joints, penetrations, and duct 

to hood collar connections shall have a liquid-tight 
external weld. If you have an Automatic Fire Damper 
please refer to that manual for installation instructions 
now.

Supply

Supply ductwork (where applicable) should be 
connected to the hood in a manner approved by the 
local code authorities.
For proper installation of duct collars when they are 
shipped unattached see Installing Duct Collars on  
page 10.

Hood

UTILITY

CABINET

TOP VIEW

HOOD

TOP VIEW

SUPPLY PLENUM

SUPPLY PLENUM SHELL

END VIEW

HOOD FRONT

Option #2

Uni-Strut supplied by others

Option #3

Threaded Rod
supplied by others

Threaded Rod

‘C’ Clamp

Hood Standing Seam

Hanging Clip bolted to plenum shell

Hanging Clip

Option #2

The uni-strut (U channel) that holds the hood up, 
cantilevers over the end of the hood and is
mounted to the Air Curtain Supply Plenum (ASP)
hanger brackets 

Option #1

For plenums < than or = 96 inches 
Two (2) clips are needed.

For plenums > than 96 inches
Three (3) clips are needed.

The third clip is located in the 
center of the plenum length.

Option #1

Attach hanging clip to hood
standing seam with the 
supplied ‘C’ clamps.

Optional:

 Drill and bolt a 

1/4-20 SS bolt through the
clip and hood standing seam

Option #1

Hanging clip could be 23.5 inches from end if there is a utility cabinet on the
end of the hood.

Option #1 :  

Hanging Clip

Hanger Bracket

Note:   Supply plenums are standardly supplied with hanging clips (Option #1).

 

If Option #1 is not applicable, use Options #2 or #3

Hanging methods for supply plenums 

ASP: Air Curtain Supply Plenum

FSP: Face Supply Plenum

VSP: Variable Supply Plenum

Option #1: Hanging Clip

Option #2: Uni-Strut

Option #3: Threaded Rod

11.5

23.5

Hood

UTILITY

CABINET

TOP VIEW

HOOD

TOP VIEW

SUPPLY PLENUM

SUPPLY PLENUM SHELL

END VIEW

HOOD FRONT

Option #2

Uni-Strut supplied by others

Option #3

Threaded Rod
supplied by others

Threaded Rod

‘C’ Clamp

Hood Standing Seam

Hanging Clip bolted to plenum shell

Hanging Clip

Option #2

The uni-strut (U channel) that holds the hood up, 
cantilevers over the end of the hood and is
mounted to the Air Curtain Supply Plenum (ASP)
hanger brackets 

Option #1

For plenums < than or = 96 inches 
Two (2) clips are needed.

For plenums > than 96 inches
Three (3) clips are needed.

The third clip is located in the 
center of the plenum length.

Option #1

Attach hanging clip to hood
standing seam with the 
supplied ‘C’ clamps.

Optional:

 Drill and bolt a 

1/4-20 SS bolt through the
clip and hood standing seam

Option #1

Hanging clip could be 23.5 inches from end if there is a utility cabinet on the
end of the hood.

Option #1 :  

Hanging Clip

Hanger Bracket

Note:   Supply plenums are standardly supplied with hanging clips (Option #1).

 

If Option #1 is not applicable, use Options #2 or #3

Hanging methods for supply plenums 

ASP: Air Curtain Supply Plenum

FSP: Face Supply Plenum

VSP: Variable Supply Plenum

Option #1: Hanging Clip

Option #2: Uni-Strut

Option #3: Threaded Rod

11.5

23.5

Содержание Grease Grabber H2O XGH2O

Страница 1: ...prevent accidental power up CAUTION When servicing the unit motor may be hot enough to cause pain or injury Allow motor to cool before servicing Installation Operation and Maintenance Manual Please re...

Страница 2: ...each item have been received If any items are missing report shortages to your local representative to arrange for obtaining missing parts Sometimes it is not possible that all items for the unit be s...

Страница 3: ...ically engaged to run at the same time each day through a programmable timer Grease Grabber H2O System Function Table of Contents Grease Grabber H2O System Function 3 Cleaning Cycle Manual and Automat...

Страница 4: ...r and detergent will fill the hood reservoir The soapy water will then be cycled through the hood by the attached recirculation pump cleaning both the filter banks and the exhaust plenum area on a tim...

Страница 5: ...ILL DETERGENT After pressing CLEAN HOOD Fans will automatically stop 472617 In case of emergency the wash cycle can be stopped by pressing CLEAN HOOD CLEAN HOOD FAN ON OFF SYSTEM FAULT FILL DETERGENT...

Страница 6: ...on process 1 2 3 Profile of Hood Profile of Hood Profile of Hood Profile of Hood Remove side back and top lumber Remove 3 inch lag screws Holding the front lifting skid in place and position the skid...

Страница 7: ...r must be contacted at this time After the fire system has been installed mount the enclosures then the supply plenums If an Horizontal Supply Plenum is provided it should be installed before the encl...

Страница 8: ...u clips and bolts Caulk this joint with NSF Approved silicone caulk GE SCS1000 or its equivalent The caulk is not provided NOTE Before hanging the hoods please verify the hood marks to make sure the...

Страница 9: ...ion instructions now Supply Supply ductwork where applicable should be connected to the hood in a manner approved by the local code authorities For proper installation of duct collars when they are sh...

Страница 10: ...in mm in mm ft m Back Supply 35 0 15 878 6 152 4 Variable Variable 3 to 16 91 to 4 88 145 cfm ft 246 36 m3 hr Air Curtain Supply 14 inch 9 5 4 31 14 355 6 10 254 3 to 16 91 to 4 88 110 cfm ft 186 89 m...

Страница 11: ...STED LOCATION ABOVE CUT 1 4 in X 24 in OPENING AT CENTERED ON WIDTH OF THE SUPPLY IF MODULE 6 ft STEP 1 4 in TO 6 in FASTEN WITH S PLACE THE DU L MODULE LENGTH L 2 L 2 L 2 L MODULE LENGTH L 4 L 4 STEP...

Страница 12: ...UPPLY IF IT WILL NOT INTERFERE 2 BEFORE THE HOOD IS HUNG THE BACKSUPPLY MUST BE SECURED INSTRUCTIONS AND THE FOLLOWING PROPERLY AS DESCRIBED IN STEP 3 in STEP 4 5 Connect the remaining ductwork for th...

Страница 13: ...provided Note Installation instructions may not be applicable for concrete ceilings Installing End Skirts 1 After the hood is hung in position slide the hemmed form on top of the end skirt onto the e...

Страница 14: ...PIECES PANELS UP TO 48 IN 1219 2 MM WIDE SHIP IN ONE PIECE OVER 48 IN 1219 2 MM IN MULTIPLE PIECES Length 1 inch 25 4 mm Heigth Length Height 1 After the hood is hung in position slide the flat flang...

Страница 15: ...nnection Exhaust duct connection is to be a continuous liquid tight weld to hood Supply Duct Connection Supply duct connection to be tack welded with 1 to 2 inch tacks or sheet metal screws at 3 to 6...

Страница 16: ...detergent is non caustic and biodegradable waste water from the hood can be drained in any typical grease trap A One inch unions B Detergent tank C Mounting plate D Isolators qty of four E Detergent...

Страница 17: ...facturer for use in the wash system Use Formula G 510 full strength This product is biodegradable non caustic and safe for kitchen staff to use If G 510 detergent is not used the cleanliness of the ex...

Страница 18: ...ive order of time for example 8 00 pm ON 9 00 pm ON 10 00 pm ON Not 8 00 pm ON 10 00 pm ON 9 00 pm ON b Do not overlap event times for example 8 00 pm ON 12 00 pm OFF and 9 00 pm ON 11 00 pm OFF c Set...

Страница 19: ...se valve until water mist is no longer felt above equipment Once the valve is set it will not need to be moved again Verify the Grease Grabber H2O sequence of operation see the diagram of wash sequenc...

Страница 20: ...pump OFF Spray for 5 minutes Spray for 5 minutes 20 minute dry time Wash rinse dry complete No Temperature Interlock Exhaust Mode in Fire STOP Exhaust Mode in Fire RUN No Yes Shut OFF exhaust fan s T...

Страница 21: ...x 4 846 x Average inlet slot velocity x 2 47 144 Average Velocity Sum of Velocity Readings Number of Readings Hood Length 48 to 72 inches 72 to 120 inches 120 to 192 inches Minimum Number of Test Loca...

Страница 22: ...MICROSWITCH IN NORMAL INSTALLATION THE YELLOW WIRE IS TO BE USED ONLY FOR EXTINGUISHER ALARM LIGHTS CIRCUITS ETC L1 L2 PUSHBUTTON SWITCH 120V 60HZ K1 Ka K1b CURRENT DRAW MAX 8A RESISTIVE 8A INDUCTIVE...

Страница 23: ...WITH ANSUL ANSUL SNAP ACTION SWITCH BLACK RED NEUTRAL HOT 1 L2 L NOTE ANSUL file name Typicalwiringschematicelectricequipmentshutdowndetail ai File received on August 4 2010 TEMPERATURE RATING 110V 6...

Страница 24: ...K RD 12 GA 12 GA 12 GA 18 GA 18 GA 18 GA 18 GA BK BK BK BK N WHT BL BL PR PR PR PR PR BR PR PR PR 18 GA YW YW YW 12 GA 18 GA PR PR R6 120 VAC Wash Timer Relay A1 A2 T1 T2 Timer Contact BK RD BK N WHT...

Страница 25: ...ing the filters Ensure no gaps are between filters after installation If any filter appears damaged consult factory for replacement Floats The floats need to be inspected two weeks after start up and...

Страница 26: ...ks water leaking through the access panels when filling Ensure access panels are securely in place If leak persists partially close inlet water ball valve by others upstream of fill solenoid to reduce...

Страница 27: ...guide on page 26 Grease Grabber H2O Start Up Checklist Check boxes when item has been verified and gone over with customer Hook Up o Electrical Connected 120V 1 30A to terminals L1 and N for wash cont...

Страница 28: ..._______________________________ Date___________________ Time______________ AM PM Notes ___________________________________________ _________________________________________________ ___________________...

Отзывы: