Accurex Grease Grabber H2O XGH2O Скачать руководство пользователя страница 24

24

Model XGH2O

U1 (FX-14)

42 - DO1 

21 - DI 

COM

26 - DI4

41 - DO1 COM 

24VAC

120VAC

S1 120 VAC

Fill

Fire System

Hood Lights

Hood Lights

N

TR1

(N)

(H)

(H)

FS

FC

83 - 24V (H)

82 - 24V (C) 

23 - DI2

Clean Hood

PB3

24 - DI3

Start-Stop Fan

PB2

45 - DO2 

S2 120 VAC

Nozzle 1

48 - DO3

S3 120 VAC

Nozzle 2

52 - DO4 

55 - DO5 

S4 120 VAC

Drain

58 - DO6

C1 120 VAC

Recirc Pump

A2

A1

62 - DO7

R1 24 VAC

Fan

A1

A2

65 - DO8 

R2 24 VAC

Detergent Pump

A1

A2

68 - DO9

44 - DO2 

COM

47 - DO3 COM

51 - DO4 COM 

54 - DO5 COM

57 - DO6 COM 

61 - DO7 

COM 

64 - DO8 COM 

67 - DO9 COM 

25 - DI 

COM
27 - DI5

Tank Full

FL1

28 - DI6

Tank Low

FL2

Det Low

FL4

R3 24 VAC

Det Low

A1

A2

Low Det Indicator

R4 24 VAC

Fire Mode

A1

A2

R4

Fire Mode

R3

Det Low

AR 24 VAC

3

2

AR

L4

S1

N

S2

S3

N

M1

S4

N

SC

F1

F2

F4

C

R1  

Fan 

Interlock

P2

Detergent

Pump

Motor

R2

N

RP

NO

21

24

21

P1

Recirculating

Pump

Motor

C1 120VAC

Recirculating

Pump

Contactor

14     11

BK                         

 WHT

BK                         

WHT

32 - DI9

Clean Hood 

Indicator

L3

6

Lights On/Off

PB1

Fan Indicator

L2

L1

Lights Indicator

R5

3 - Ext V

1 - AI COM 

R1

11

R3

N1

H1

DP

L1

L2

L3

R5 120 VAC

Hood Lights 

LED Relay 

72 - AO1

73 - AO COM

V1

VC

XGH2O/VAV Fan Mode 

Interlock Connection

0VDC - Fan Auto

5VDC - Fan OFF

10VDC - Fan On for Dry

+VDC

 COM

M2

22 - DI1

C1

Overload

96

A1

A2

L2

L3

PR

BK

BK

BK

BK

BK

BL

BL

BL

BL

BK

BK

OR

OR

OR

OR

OR

OR

OR

OR

OR

BL

BL

PR

BK

BL

WHT

WHT

WHT

WHT

WHT

WHT

RD

RD

RD

PR

RD

RD

RD

YW

YW

BL

BK

YW

YW

BR

YW

BL

YW

PR

BK

RD

12 GA

12 GA

12 GA

18 GA

18 GA

18 GA

18 GA

BK

BK

BK

BK

N

WHT

BL

BL

PR

PR

PR

PR

PR

BR

PR

PR

PR

18 GA

YW

YW

YW

12 GA

18 GA

PR

PR

R6 120 VAC

Wash Timer 

Relay

A1

A2

T1

T2

Timer 

Contact

BK

RD

BK

N

WHT

RD

R6

Wash Timer

11

PR

PR

5

10

13

11

1

6

2

3

15

14

N

WHT

36 - DI12

Safety

FL3

F3

PR

E2

14 GA

14 GA

E1

2 - AI1

4 - AI COM

TS

TC

OR

BR

81 - Earth

5 - AI2

6 - AI COM

I1

IC

OR

BR

Temp Sensor

(Freeze 

Protection)

(If used)

Temp Sensor

(IMC Interlock)

(If used)

PR

BK

12 GA

WHT

BK

RD

WHT

BK

RD

7 - AI3

6 - AI COM

Temp Sensor

(IMC Interlock)

(If used)

OR

BR

I2

IC

Recirculating Pump Size

FLA

1.0 HP

17

1.5 HP

22

Brown

White

Blue

Orange

Yellow

RP

N

Recirculating Pump

Motor Wiring

Hood Lights

T3

T3

T2

T2

L1

T1

T1

14

11

14

11

14

24

24

14

C

95

WHT

WIRED FR

OM MO

TOR 

ON RECIR

CULA

TING

PUMP

21

MOLEX PLUG FOR KEYPAD

(IF KEYPAD IS REMOTE MOUNTED, PLUG IS FIELD CONNECTED)

FIELD  INSTALLED WIRING

Melink Fan Stop

Melink Fan 

Stop Common

120VAC 1PH. 30 AMPS

SUPPLY POWER

WATER WASH

120VAC 1PH. 15AMPS

SUPPLY POWER

HOOD LIGHTS

FAN INTERLOCK

CONTACT

L1

L1

L1

41

41

41

41

41

41

41

T2

N

N

N

N

83

83

83

83

83

83

83

14

82

82

82

82

82

82

LF3

DP

RP

LF1

F4

FS

60

20

30

67

67

67

67

67

51

52

N

N

N

N

N

95

58

62

65

68

25

27

28

36

72

73

2

4

5

6

42

45

48

55

83

1

1

21

21

21

21

22

26

32

23

24

E2

E1

E1

H1

H1

L2

L1

N1

7

6

DISC

FU2

FU1

FU3

3POLE 32 AMPS

5 AMP

25 AMP

3 AMP

ECO

P.O.BOX 410 SCHOFIELD, WISCONSIN 54476-0410

CAD DRAWING NO.

REV.

PART NO.

-

IAN31295

LADDER DIAGRAM, 

GGH2O

473596

Wiring Diagram

Wiring diagram is located on the inside cover of the control cabinet located on the end of the hood.

Содержание Grease Grabber H2O XGH2O

Страница 1: ...prevent accidental power up CAUTION When servicing the unit motor may be hot enough to cause pain or injury Allow motor to cool before servicing Installation Operation and Maintenance Manual Please re...

Страница 2: ...each item have been received If any items are missing report shortages to your local representative to arrange for obtaining missing parts Sometimes it is not possible that all items for the unit be s...

Страница 3: ...ically engaged to run at the same time each day through a programmable timer Grease Grabber H2O System Function Table of Contents Grease Grabber H2O System Function 3 Cleaning Cycle Manual and Automat...

Страница 4: ...r and detergent will fill the hood reservoir The soapy water will then be cycled through the hood by the attached recirculation pump cleaning both the filter banks and the exhaust plenum area on a tim...

Страница 5: ...ILL DETERGENT After pressing CLEAN HOOD Fans will automatically stop 472617 In case of emergency the wash cycle can be stopped by pressing CLEAN HOOD CLEAN HOOD FAN ON OFF SYSTEM FAULT FILL DETERGENT...

Страница 6: ...on process 1 2 3 Profile of Hood Profile of Hood Profile of Hood Profile of Hood Remove side back and top lumber Remove 3 inch lag screws Holding the front lifting skid in place and position the skid...

Страница 7: ...r must be contacted at this time After the fire system has been installed mount the enclosures then the supply plenums If an Horizontal Supply Plenum is provided it should be installed before the encl...

Страница 8: ...u clips and bolts Caulk this joint with NSF Approved silicone caulk GE SCS1000 or its equivalent The caulk is not provided NOTE Before hanging the hoods please verify the hood marks to make sure the...

Страница 9: ...ion instructions now Supply Supply ductwork where applicable should be connected to the hood in a manner approved by the local code authorities For proper installation of duct collars when they are sh...

Страница 10: ...in mm in mm ft m Back Supply 35 0 15 878 6 152 4 Variable Variable 3 to 16 91 to 4 88 145 cfm ft 246 36 m3 hr Air Curtain Supply 14 inch 9 5 4 31 14 355 6 10 254 3 to 16 91 to 4 88 110 cfm ft 186 89 m...

Страница 11: ...STED LOCATION ABOVE CUT 1 4 in X 24 in OPENING AT CENTERED ON WIDTH OF THE SUPPLY IF MODULE 6 ft STEP 1 4 in TO 6 in FASTEN WITH S PLACE THE DU L MODULE LENGTH L 2 L 2 L 2 L MODULE LENGTH L 4 L 4 STEP...

Страница 12: ...UPPLY IF IT WILL NOT INTERFERE 2 BEFORE THE HOOD IS HUNG THE BACKSUPPLY MUST BE SECURED INSTRUCTIONS AND THE FOLLOWING PROPERLY AS DESCRIBED IN STEP 3 in STEP 4 5 Connect the remaining ductwork for th...

Страница 13: ...provided Note Installation instructions may not be applicable for concrete ceilings Installing End Skirts 1 After the hood is hung in position slide the hemmed form on top of the end skirt onto the e...

Страница 14: ...PIECES PANELS UP TO 48 IN 1219 2 MM WIDE SHIP IN ONE PIECE OVER 48 IN 1219 2 MM IN MULTIPLE PIECES Length 1 inch 25 4 mm Heigth Length Height 1 After the hood is hung in position slide the flat flang...

Страница 15: ...nnection Exhaust duct connection is to be a continuous liquid tight weld to hood Supply Duct Connection Supply duct connection to be tack welded with 1 to 2 inch tacks or sheet metal screws at 3 to 6...

Страница 16: ...detergent is non caustic and biodegradable waste water from the hood can be drained in any typical grease trap A One inch unions B Detergent tank C Mounting plate D Isolators qty of four E Detergent...

Страница 17: ...facturer for use in the wash system Use Formula G 510 full strength This product is biodegradable non caustic and safe for kitchen staff to use If G 510 detergent is not used the cleanliness of the ex...

Страница 18: ...ive order of time for example 8 00 pm ON 9 00 pm ON 10 00 pm ON Not 8 00 pm ON 10 00 pm ON 9 00 pm ON b Do not overlap event times for example 8 00 pm ON 12 00 pm OFF and 9 00 pm ON 11 00 pm OFF c Set...

Страница 19: ...se valve until water mist is no longer felt above equipment Once the valve is set it will not need to be moved again Verify the Grease Grabber H2O sequence of operation see the diagram of wash sequenc...

Страница 20: ...pump OFF Spray for 5 minutes Spray for 5 minutes 20 minute dry time Wash rinse dry complete No Temperature Interlock Exhaust Mode in Fire STOP Exhaust Mode in Fire RUN No Yes Shut OFF exhaust fan s T...

Страница 21: ...x 4 846 x Average inlet slot velocity x 2 47 144 Average Velocity Sum of Velocity Readings Number of Readings Hood Length 48 to 72 inches 72 to 120 inches 120 to 192 inches Minimum Number of Test Loca...

Страница 22: ...MICROSWITCH IN NORMAL INSTALLATION THE YELLOW WIRE IS TO BE USED ONLY FOR EXTINGUISHER ALARM LIGHTS CIRCUITS ETC L1 L2 PUSHBUTTON SWITCH 120V 60HZ K1 Ka K1b CURRENT DRAW MAX 8A RESISTIVE 8A INDUCTIVE...

Страница 23: ...WITH ANSUL ANSUL SNAP ACTION SWITCH BLACK RED NEUTRAL HOT 1 L2 L NOTE ANSUL file name Typicalwiringschematicelectricequipmentshutdowndetail ai File received on August 4 2010 TEMPERATURE RATING 110V 6...

Страница 24: ...K RD 12 GA 12 GA 12 GA 18 GA 18 GA 18 GA 18 GA BK BK BK BK N WHT BL BL PR PR PR PR PR BR PR PR PR 18 GA YW YW YW 12 GA 18 GA PR PR R6 120 VAC Wash Timer Relay A1 A2 T1 T2 Timer Contact BK RD BK N WHT...

Страница 25: ...ing the filters Ensure no gaps are between filters after installation If any filter appears damaged consult factory for replacement Floats The floats need to be inspected two weeks after start up and...

Страница 26: ...ks water leaking through the access panels when filling Ensure access panels are securely in place If leak persists partially close inlet water ball valve by others upstream of fill solenoid to reduce...

Страница 27: ...guide on page 26 Grease Grabber H2O Start Up Checklist Check boxes when item has been verified and gone over with customer Hook Up o Electrical Connected 120V 1 30A to terminals L1 and N for wash cont...

Страница 28: ..._______________________________ Date___________________ Time______________ AM PM Notes ___________________________________________ _________________________________________________ ___________________...

Отзывы: