4. Boiler final testing

Each boiler comes with an inspection certificate.
The inspection certificate is filled in by an Authorized Service Centre to allow the user enjoying all benefits offered by the insur-
ance provided by the manufacturer in accordance with the specifications on the inspection certificate.
The inspection certificate is filled in FREE OF CHARGE.

4.1. Preliminary checking

Prior to testing the boiler check that:
- the fumes exhaust pipe and the terminal part are installed in accordance with instructions: 

when the boiler is switched on, no

combustion products leaks are detected

;

- the supply voltage of the boiler is 230 V - 50 Hz;
- the system is properly filled with water (pressure gauge 1÷1.3 bar);
- all interception valves (if provided) of the system pipes are open;
- the gas network matches the boiler calibration: otherwise, perform the conversion of the boiler to the gas type use available (see section

3.7): this operation must be performed by qualified technicians;

- the gas supply valve is open;
-

no gas leaks are detected;

- the main power switch upstream the boiler is enabled;
- the 3 bar safety valve is not blocked;
- no water leaks are detected;
- the condensate draining siphon, fitted on the boiler, drains correctly the condensate and is not clogged.

If the boiler has not been installed according to the laws and regulations, warn the plant manager and do not 
perform testing on the boiler.

4.2. Start-up and shut-down

For the switching on and off of the boiler follow the "

Instructions for the user

".

Press for the cycle time the key “

” (

D

 fig. 1) to activate the O

2

.menu.

Press the keys "

" or "

" (

F

 or 

e

 fig. 1) to change the current RFlame set value and to vary the O

2

.

Press the key “

” (for the cycle time) to confirm the calibration to "P0" and "

" (for the cycle time) to move to the second level and adjust 

"P1". Calibrate the CO

2

 by following the steps performed to adjust the minimum value. 

Press the key “

” to confirm and "

" to go to adjust "P2” to the maximum. Adjust the value as per the table

Confirm using the key “

”.

Press the key “

” (without waiting for the cycle time to finish the process) and save the adjustments made.

MANU ADJUSTMENT

The display shows "P0" and the board is ready to adjust the CO

2

 value at minimum power.

Under this condition:
"

" (

D

 fig. 1) is used to switch between the Power / CO

2

 menu (for the cycle time).

"

" or "

" (

F

 or 

E

 fig. 1) are used to increase / decrease the CO

2

 value or change the system power (if the related symbol flashes).

Press for the cycle time the key “

” (

D

 fig. 1) to enable the CO

2

 menu.

Press the keys "

" or "

" (

F

 or 

E

 fig. 1) to change the current RFlame set value and to vary CO

2

.

Press the key “

” (for the cycle time) to confirm the calibration to "P0" and "

" (for the cycle time) to move to the second level and adjust 

"P1". Calibrate the CO

2

 by following the steps performed to adjust the minimum value. 

Press the key “

” to confirm and "

" to go to adjust "P2” to the maximum. Adjust the value as per the table

Confirm using the key “

”.

Press the key “

” (without waiting for the cycle time to finish the process) and save the adjustments made.

Exit at any moment during function adjustment by pressing for the cycle time the key “

” (

A

 fig. 1).

Set P08 to 70% and P09 to 80%.

Содержание PLAY ENTRY 20

Страница 1: ...PLAY ENTRY 20 Wall mounted gas condensing boiler for heating and DHW production PLAY ENTRY 20 INSTALLATION MANUAL...

Страница 2: ...of 16 April 2013 the plant booklet must be filled by the company assigned to perform installation of the boiler after having detected the combustion parameters Read carefully the warranty conditions a...

Страница 3: ...tervene contact specialised and authorized personnel only Any repair of the product must be performed using original spare parts Failure to comply with the indications given above can compromise the s...

Страница 4: ...les only the domestic hot water distribution function it is displayed the temperature of the delivery system 5 To enable both the heating function and the domestic hot water distribution function hold...

Страница 5: ...features 24 2 6 ERP data and Labelling 25 3 Instruction for the installer 26 3 1 Installation regulations 26 3 2 Installation 26 3 2 1 Packaging 26 3 2 2 How to chose the installation place of the boi...

Страница 6: ...ing set point for external temperature probe based operation 38 fig 15 Pressure head curves available Play Entry 20 42 fig 16 Play Entry Wiring diagram 43 fig 17 Components view 45 fig 18 Gas valve 46...

Страница 7: ...ature values and parameters F Increase temperature values and parameters To access the interface press a key Upon activation the interface enables access to all keys as well as the back lighting of th...

Страница 8: ...lues the parameters values and the faults 4 Indicates to manually RESET the error 5 Indicates the OT is ON 6 Indicates the system pressure unit of measurement 7 Indicates the domestic hot water instan...

Страница 9: ...able in sequence the WINTER SUMMER and OFF modes All keys are enabled in this phase When the WINTER mode is enabled both functions are active domestic hot water delivery and heating water delivery Whe...

Страница 10: ...ed the value is saved and the display returns to its normal operation Press the key domestic C fig 1 to display the delivery heating water temperature Press the keys E fig 1 or F fig 1 to change the d...

Страница 11: ...up and the screen will alternate the messages In 1 sec n00 1 sec and the value of the related parameter 5 sec Press briefly F fig 1 to scroll through the various indices When the last index available...

Страница 12: ...al operation hours 0 99 h x 100 0 0 to 9 9 fast flashing 1 from 10 a 99 Co1 Display burner operating hours 0 99 h x 100 0 0 to 9 9 fast flashing 1 from 10 a 99 Co2 Display burner total ignitions 0 99...

Страница 13: ...tic hot water function enabled Displays the temperature of the domestic hot water in delivery the symbol flashes Boiler switch in WINTER position Domestic function enabled Displays the temperature of...

Страница 14: ...anomaly Failure to start up Safety thermostat has tripped Parasitic flame NO water circulates in the circuit NTC return probe failure Overtemperature of the system TCH TSP81 Delta T CH Ret TSP82 1 Gas...

Страница 15: ...tion fault upon start up 2 Problem on the SGV circuit Flame loss upon start up for over 6 consecutive times Software error Board not configured Blocked for generic causes Table 4 BOILER STATUS LCD dis...

Страница 16: ...ows it The faults displayed on the in terface disappear and the display goes off 1 8 Automatic draining of the air in the system Press simultaneously the keys and for the cycle time to enable the air...

Страница 17: ...een flashes 2 fig 1 and the value being set for the heating water tem perature is displayed When the heating system requires heat the symbol of heating on the display flashes 2 fig 1 and the instantan...

Страница 18: ...r adjusts automatically the temperature of the heating water by increasing it if the external tem perature drops and decreasing it when the external temperature rises to improve comfort and save energ...

Страница 19: ...f malfunction of the air suction and or fumes exhaust systems the boiler gets blocked and the flashing code E13 or E96 is dis played on the screen the fumes probe has tripped In this case please conta...

Страница 20: ...control panel ignoring the settings made on the remote control In this case please contact an Authorized Service Centre or personnel qualified for maintenance 1 12 Maintenance Provide for periodic mai...

Страница 21: ...ion Motor controlled divert valve Flow meter for domestic use hot water User interface Built in LCD interface for the displaying and controlling of the boil er operation mode OFF UNLOCK WINTER and SUM...

Страница 22: ...let SI Siphon inspection plug M Heating system delivery line C Hot water for domestic use outlet R Heating system return line RS Safety valve filling and draining cock RC Supply valve Bottom view Top...

Страница 23: ...ic use outlet F Hot water inlet R Heating system return line Play Entry 20 2 4 Technical data on the operation The pressures inside the burner shown in the following page must be checked after the boi...

Страница 24: ...water circuit bar 0 5 Maximum pressure of the domestic hot water circuit bar 6 Specific capacity for domestic use hot water T 30K l min 11 Power Supply Voltage Frequency V Hz 230 50 Fuse on the power...

Страница 25: ...elements At full load elmax 0 073 kW Thermal dispersion in stand by Pstby 0 069 kW At partial load elmin 0 054 kW Power consumption of the ignition burner Pign 0 kW In stand by mode PSB 0 004 kW Yearl...

Страница 26: ...he template for boiler fixing to the wall fig 5 3 2 2 How to chose the installation place of the boiler In determining the place where the boiler is to be installed take into account the following the...

Страница 27: ...A A A AY Y Y Y S S S SV V V V M M M M R R R R 173 173 93 10 86 137 O 100 O 80 122 138 67 68 20 A SOLUZIONE A installazione a muro con staffa a corredo SOLUZIONE B installazione a muro con dima optiona...

Страница 28: ...same points on the template bottom side prearrange connection for condensate draining and a 3 bar safety valve draining too hang the boiler to the hooks of the blocks connect the boiler to the supply...

Страница 29: ...s of the boiler check the air suction fumes exhaust pipes inlet which might be obstructed or inappropriate for fumes discharging into the atmosphere For the air suction fumes exhaust system must be us...

Страница 30: ...r from another floor L 2200 Between two terminals vertically M 1500 Between two terminals horizontally N 1000 From a front surface facing without openings or terminals within 3 meters radius from the...

Страница 31: ...must be positioned in a square having 500 mm side The boiler must be equipped with a fan upstream the combustion chamber heat exchanger Type C43 The boiler is designed to be connected to a collective...

Страница 32: ...e downwards of about 1 in the output direction to prevent the entering of rainwater Type C33 Play Entry 20 The minimum permitted length of vertical coaxial pipes is 1 meter The maximum permitted lengt...

Страница 33: ...s Installation type B23 The minimum length of the air suction pipe must be 1 meter The maximum permitted pipe length for the Play Entry 20 model is 28 metres 3 2 6 4 Air suction fumes exhaust with spl...

Страница 34: ...ep function with minimum power To exit the chimney sweep function press and hold for 3 seconds the key B fig 1 and return to normal operation The chimney sweep function duration is 15 minutes 3 2 8 Co...

Страница 35: ...condensate produced in combustion phase has to be conveyed through the condensate outlet spout to an exhaust system which flows out into the domestic waste discharge network that due to their basicit...

Страница 36: ...performances of the remote as well as those of the boiler The cables of the Remote Control must be connected to the terminals A and B of the terminal board fig 16 For the installation of the remote co...

Страница 37: ...the manufacturer decreases the performance of the probe and boiler as well The external temperature measuring probe must be connected with a double insulated cable having minimum section of 0 35 mm2 T...

Страница 38: ...sponding to 30 if the external temperature equals 5 C the temperature delivered will be equal to 70 C By setting a dummy ambient temperature of 23 C with external temperature at 5 C the temperature de...

Страница 39: ...CHANGE P20 Selects ACS minimum set point value 10 50 10 P21 Selects the low temperature areas 0 1 0 0 high temperature 1 low temperature P22 Not used P23 Selects the pump activation time min cold area...

Страница 40: ...O NOT CHANGE P58 Not used P59 Not used P60 Offset additional to the shut down temperature after burner ignition 0 20 0 DO NOT CHANGE P61 Selects the fumes exhaust temperature alarm 20 150 105 P62 Not...

Страница 41: ...93 Therefore use specific products suitable for systems made from multiple metals see paragraph 3 2 4 CAUTION The pressure sensor does not send the electric consent for burner ignition when the press...

Страница 42: ...tween the system supply and return lines to a value set in the boiler parameters 2 Fixed speed operation In the fixed operation mode the circulator speed remains constant at maximum value The circulat...

Страница 43: ...43 Termostato ambiente Opentherm Sonda esterna Alimentazione caldaie fig 16 3 6 Electrical connections 3 6 1 Play Entry 20 Models...

Страница 44: ...keys or F or E and fig 1to edit the value of the parameter selected Press for the cycle time the key D fig 1 to save the new setting Press simultaneously for the cycle time the keys and B C fig 1 to e...

Страница 45: ...eedom in calibrating the CO2 OPERATIONS TO BE PERFORMED Access the chimney sweep function see paragraph 3 2 7 and check if the value of CO2 is within the limits of Table 12 both as regards maximum Hi...

Страница 46: ...fig 18 A fig 19 DIAPHRAGMS DIAMETER Methane GPL mm 20 kW 5 6 Table 11 Diaphragms diameter Fuel O2 values CO2 values From To From To Metano 5 7 4 0 8 5 9 5 GPL 5 9 4 5 10 0 10 9 Table 12 O2 and CO2 val...

Страница 47: ...the boiler follow the Instructions for the user Press for the cycle time the key D fig 1 to activate the O2 menu Press the keys or F or e fig 1 to change the current RFlame set value and to vary the...

Страница 48: ...mes exhaust circuit clean the heat exchanger clean the condensate draining siphon and pipes If the boiler is subjected to these interventions for the first time check the declaration of conformity of...

Страница 49: ...for combustion problems upon ignition 2 E 87 Problem on the SGV circuit E 91 Flame loss for over 6 consecutive times with max correction ignition to ON E 98 SW error board error E 99 Generic fault Ta...

Страница 50: ......

Страница 51: ...51...

Страница 52: ...tolo puramente indicativo la A2B Accorroni E G S r l si riserva di apportare eventuali modi che senza alcun preavviso web site www accorroni it e mail a2b accorroni it A2B Accorroni E G s r l Via d An...

Отзывы: