General Notes for the operators assigned for installation, maintenance and use

This user’s manual, which represents an integral and essential part of the product, will be delivered by the installer to the user, who has to 
preserve it carefully for further consultation.
This user’s manual must accompany the appliance if the latter gets sold or transferred. 

This appliance has been manufactured to be connected to a water heating system for the heating of the environments 
and for domestic hot water distribution system.
Any other use is considered improper and, therefore, dangerous for people, animals and/or things.

The installation must be made in compliance with the regulations in force and according to the manufacturer's instructions given in this 
manual:
an incorrect installation can cause injury to persons, animals and/or damages to things; the manufacturer declines any liability in such case.

The damages caused by improper installation or use or due to failure to comply with the manufacturer's instructions exclude any liability 
of the latter, be it listed in the contract or not.
Prior to installing the appliance check to make sure its technical data match the requirements for its correct use in the system.

Ensure, as well, that the appliance is intact and has not suffered any damage during transport and handling: do not install damaged and/
or faulty appliances.

Do not obstruct the air suction grids.

For all appliances equipped with options or kits (including electrical ones) use exclusively original accessories.

Do not disperse packagings in the environment after installation: all materials are recyclable and, as a consequence, they must be sent 
to separate wastes collection centres.

Do not leave the packaging at the children's reach; due to their nature they could be source of hazards.

In the event of fault and/or faulty operation of the appliance, shut it off and do not attempt to repair it or to intervene: contact specialised 
and authorized personnel only.
Any repair of the product must be performed using original spare parts

Failure to comply with the indications given above can compromise the safety of the appliance and expose people, animals and/or things 
to danger.

Provide for periodic maintenance of the appliance according to the schedule specified in the appropriate 
section of this manual.
Subjecting the appliance to proper maintenance allows it to work in the best conditions, to protect the envi-
ronment and ensure full safety for people, animals and/or things. 
Incorrect maintenance, both as regards how and when it is performed, can be a source of hazards for per-
sons, animals and/or things.

The manufacturer recommends its clients to have maintenance and repair interventions performed by Authorised Service Centres trained 
to perform the such operations.

In the event of long shut-down periods, disconnect the appliance from the mains and close the gas valve.

Warning: In this case the antifreeze electronic function of the appliance does not work.

If very low temperatures are foreseeable, add antifreeze fluid in the heating system; it is not recommended to empty the plant as it may 
damage the system. To this purpose use specific antifreeze products suitable for heating systems made from several metal types.

As regards the appliances powered by gaseous fuel, if you can smell gas, proceed as follows:
- do not operate electric switches and do not start up electrical appliances;
- do not switch on flames and do not smoke;
- close the main gas supply valve;
- open doors and windows;
- contact a Service Centre, a qualified installer or the gas supplier service centre.
It is strictly forbidden to search for gas leaks using flames.

This appliance has been designed to be installed in the countries of destination specified on the packaging 
label and on the boiler rating plate; installation in countries other than those specified can expose persons, 
animals and/or things to hazards.

The manufacturer declines any liability, be it specified in the sales contract or not, related to failure to comply with the foregoing.

Содержание PLAY ENTRY 20

Страница 1: ...PLAY ENTRY 20 Wall mounted gas condensing boiler for heating and DHW production PLAY ENTRY 20 INSTALLATION MANUAL...

Страница 2: ...of 16 April 2013 the plant booklet must be filled by the company assigned to perform installation of the boiler after having detected the combustion parameters Read carefully the warranty conditions a...

Страница 3: ...tervene contact specialised and authorized personnel only Any repair of the product must be performed using original spare parts Failure to comply with the indications given above can compromise the s...

Страница 4: ...les only the domestic hot water distribution function it is displayed the temperature of the delivery system 5 To enable both the heating function and the domestic hot water distribution function hold...

Страница 5: ...features 24 2 6 ERP data and Labelling 25 3 Instruction for the installer 26 3 1 Installation regulations 26 3 2 Installation 26 3 2 1 Packaging 26 3 2 2 How to chose the installation place of the boi...

Страница 6: ...ing set point for external temperature probe based operation 38 fig 15 Pressure head curves available Play Entry 20 42 fig 16 Play Entry Wiring diagram 43 fig 17 Components view 45 fig 18 Gas valve 46...

Страница 7: ...ature values and parameters F Increase temperature values and parameters To access the interface press a key Upon activation the interface enables access to all keys as well as the back lighting of th...

Страница 8: ...lues the parameters values and the faults 4 Indicates to manually RESET the error 5 Indicates the OT is ON 6 Indicates the system pressure unit of measurement 7 Indicates the domestic hot water instan...

Страница 9: ...able in sequence the WINTER SUMMER and OFF modes All keys are enabled in this phase When the WINTER mode is enabled both functions are active domestic hot water delivery and heating water delivery Whe...

Страница 10: ...ed the value is saved and the display returns to its normal operation Press the key domestic C fig 1 to display the delivery heating water temperature Press the keys E fig 1 or F fig 1 to change the d...

Страница 11: ...up and the screen will alternate the messages In 1 sec n00 1 sec and the value of the related parameter 5 sec Press briefly F fig 1 to scroll through the various indices When the last index available...

Страница 12: ...al operation hours 0 99 h x 100 0 0 to 9 9 fast flashing 1 from 10 a 99 Co1 Display burner operating hours 0 99 h x 100 0 0 to 9 9 fast flashing 1 from 10 a 99 Co2 Display burner total ignitions 0 99...

Страница 13: ...tic hot water function enabled Displays the temperature of the domestic hot water in delivery the symbol flashes Boiler switch in WINTER position Domestic function enabled Displays the temperature of...

Страница 14: ...anomaly Failure to start up Safety thermostat has tripped Parasitic flame NO water circulates in the circuit NTC return probe failure Overtemperature of the system TCH TSP81 Delta T CH Ret TSP82 1 Gas...

Страница 15: ...tion fault upon start up 2 Problem on the SGV circuit Flame loss upon start up for over 6 consecutive times Software error Board not configured Blocked for generic causes Table 4 BOILER STATUS LCD dis...

Страница 16: ...ows it The faults displayed on the in terface disappear and the display goes off 1 8 Automatic draining of the air in the system Press simultaneously the keys and for the cycle time to enable the air...

Страница 17: ...een flashes 2 fig 1 and the value being set for the heating water tem perature is displayed When the heating system requires heat the symbol of heating on the display flashes 2 fig 1 and the instantan...

Страница 18: ...r adjusts automatically the temperature of the heating water by increasing it if the external tem perature drops and decreasing it when the external temperature rises to improve comfort and save energ...

Страница 19: ...f malfunction of the air suction and or fumes exhaust systems the boiler gets blocked and the flashing code E13 or E96 is dis played on the screen the fumes probe has tripped In this case please conta...

Страница 20: ...control panel ignoring the settings made on the remote control In this case please contact an Authorized Service Centre or personnel qualified for maintenance 1 12 Maintenance Provide for periodic mai...

Страница 21: ...ion Motor controlled divert valve Flow meter for domestic use hot water User interface Built in LCD interface for the displaying and controlling of the boil er operation mode OFF UNLOCK WINTER and SUM...

Страница 22: ...let SI Siphon inspection plug M Heating system delivery line C Hot water for domestic use outlet R Heating system return line RS Safety valve filling and draining cock RC Supply valve Bottom view Top...

Страница 23: ...ic use outlet F Hot water inlet R Heating system return line Play Entry 20 2 4 Technical data on the operation The pressures inside the burner shown in the following page must be checked after the boi...

Страница 24: ...water circuit bar 0 5 Maximum pressure of the domestic hot water circuit bar 6 Specific capacity for domestic use hot water T 30K l min 11 Power Supply Voltage Frequency V Hz 230 50 Fuse on the power...

Страница 25: ...elements At full load elmax 0 073 kW Thermal dispersion in stand by Pstby 0 069 kW At partial load elmin 0 054 kW Power consumption of the ignition burner Pign 0 kW In stand by mode PSB 0 004 kW Yearl...

Страница 26: ...he template for boiler fixing to the wall fig 5 3 2 2 How to chose the installation place of the boiler In determining the place where the boiler is to be installed take into account the following the...

Страница 27: ...A A A AY Y Y Y S S S SV V V V M M M M R R R R 173 173 93 10 86 137 O 100 O 80 122 138 67 68 20 A SOLUZIONE A installazione a muro con staffa a corredo SOLUZIONE B installazione a muro con dima optiona...

Страница 28: ...same points on the template bottom side prearrange connection for condensate draining and a 3 bar safety valve draining too hang the boiler to the hooks of the blocks connect the boiler to the supply...

Страница 29: ...s of the boiler check the air suction fumes exhaust pipes inlet which might be obstructed or inappropriate for fumes discharging into the atmosphere For the air suction fumes exhaust system must be us...

Страница 30: ...r from another floor L 2200 Between two terminals vertically M 1500 Between two terminals horizontally N 1000 From a front surface facing without openings or terminals within 3 meters radius from the...

Страница 31: ...must be positioned in a square having 500 mm side The boiler must be equipped with a fan upstream the combustion chamber heat exchanger Type C43 The boiler is designed to be connected to a collective...

Страница 32: ...e downwards of about 1 in the output direction to prevent the entering of rainwater Type C33 Play Entry 20 The minimum permitted length of vertical coaxial pipes is 1 meter The maximum permitted lengt...

Страница 33: ...s Installation type B23 The minimum length of the air suction pipe must be 1 meter The maximum permitted pipe length for the Play Entry 20 model is 28 metres 3 2 6 4 Air suction fumes exhaust with spl...

Страница 34: ...ep function with minimum power To exit the chimney sweep function press and hold for 3 seconds the key B fig 1 and return to normal operation The chimney sweep function duration is 15 minutes 3 2 8 Co...

Страница 35: ...condensate produced in combustion phase has to be conveyed through the condensate outlet spout to an exhaust system which flows out into the domestic waste discharge network that due to their basicit...

Страница 36: ...performances of the remote as well as those of the boiler The cables of the Remote Control must be connected to the terminals A and B of the terminal board fig 16 For the installation of the remote co...

Страница 37: ...the manufacturer decreases the performance of the probe and boiler as well The external temperature measuring probe must be connected with a double insulated cable having minimum section of 0 35 mm2 T...

Страница 38: ...sponding to 30 if the external temperature equals 5 C the temperature delivered will be equal to 70 C By setting a dummy ambient temperature of 23 C with external temperature at 5 C the temperature de...

Страница 39: ...CHANGE P20 Selects ACS minimum set point value 10 50 10 P21 Selects the low temperature areas 0 1 0 0 high temperature 1 low temperature P22 Not used P23 Selects the pump activation time min cold area...

Страница 40: ...O NOT CHANGE P58 Not used P59 Not used P60 Offset additional to the shut down temperature after burner ignition 0 20 0 DO NOT CHANGE P61 Selects the fumes exhaust temperature alarm 20 150 105 P62 Not...

Страница 41: ...93 Therefore use specific products suitable for systems made from multiple metals see paragraph 3 2 4 CAUTION The pressure sensor does not send the electric consent for burner ignition when the press...

Страница 42: ...tween the system supply and return lines to a value set in the boiler parameters 2 Fixed speed operation In the fixed operation mode the circulator speed remains constant at maximum value The circulat...

Страница 43: ...43 Termostato ambiente Opentherm Sonda esterna Alimentazione caldaie fig 16 3 6 Electrical connections 3 6 1 Play Entry 20 Models...

Страница 44: ...keys or F or E and fig 1to edit the value of the parameter selected Press for the cycle time the key D fig 1 to save the new setting Press simultaneously for the cycle time the keys and B C fig 1 to e...

Страница 45: ...eedom in calibrating the CO2 OPERATIONS TO BE PERFORMED Access the chimney sweep function see paragraph 3 2 7 and check if the value of CO2 is within the limits of Table 12 both as regards maximum Hi...

Страница 46: ...fig 18 A fig 19 DIAPHRAGMS DIAMETER Methane GPL mm 20 kW 5 6 Table 11 Diaphragms diameter Fuel O2 values CO2 values From To From To Metano 5 7 4 0 8 5 9 5 GPL 5 9 4 5 10 0 10 9 Table 12 O2 and CO2 val...

Страница 47: ...the boiler follow the Instructions for the user Press for the cycle time the key D fig 1 to activate the O2 menu Press the keys or F or e fig 1 to change the current RFlame set value and to vary the...

Страница 48: ...mes exhaust circuit clean the heat exchanger clean the condensate draining siphon and pipes If the boiler is subjected to these interventions for the first time check the declaration of conformity of...

Страница 49: ...for combustion problems upon ignition 2 E 87 Problem on the SGV circuit E 91 Flame loss for over 6 consecutive times with max correction ignition to ON E 98 SW error board error E 99 Generic fault Ta...