Accorroni GHIBLI 4-5-6 ELITE Скачать руководство пользователя страница 21

page 19

been purged and the ignition is regular.

The exchanger heating phase begins after the
burner has been ignited. The exchanger reaches
the rated operating temperature after about three
minutes and at that point a thermostat starts the
fan to distribute warm air in the environment.

5.2.2 Controls

WARNING! When operations or visual
inspections are performed on the air heater,
be extremely cautious and work under safe
conditions.

Insert the water column pressure gauge tube
into the pressure outlet on the gas unit (fig. 22)
after having backed off the screw a few turns.
Start the air heater and check that the pressure
to the burner corresponds to what is indicated in
the technical data table.

If the pressure of the gas delivered to the burner
does not correspond to the value indicated, use
the special pressure set screw 

(fig. 22)

, after

having removed the protection plug, to obtain
the specified value. Turn it counterclockwise to
decrease the pressure and clockwise to increase
the pressure (this operation can be carried out
only when using natural gas G20).

Turn the room thermostat dial to the minimum
value and check that the burner shuts off.

Remove the pressure gauge tube and tighten
the pressure regulator screw, carefully checking
the seal. Replace the regulator protection plug.

WARNING! When the burner turns off, the
fan(s) will continue to operate for a few
minutes, to properly cool the exchanger.
Therefore, it is important not to turn off the
air heater using the mains switch, that also
cuts off the power supply to the fan(s), since
this might lead to overheating and trip the
safety thermostat.

Then repeat the start-up operation to observe
and check that the burner has ignited correctly
and that the flame is stable.

5.3 USEFUL INFORMATION

It is recommended that the user be informed
about all the operations necessary to use the
air heater correctly, with particular reference
to the ignition and shutdown phases and
about the importance of periodic tests, which
must be performed at least once every year
by skilled personnel.

5.2 IGNITION

5.2.1 Ignition procedure

(Refer  to fig. 21 when reading the following
section )

a)

Place switch (A) in the on position "I" to start
the ignition cycle. If the digital timer has been
installed, refer to the instructions for that
device to perform the additional operations.

b)

Turn the room thermostat dial (D) clockwise
to the highest value. This marks the beginning
of the start-up phase, indicated when the
green led (E) turns on.

c)

Check that the red led  (F) is turned off. If it is
on, this means that the burner control
equipment is in the "lockout" position. In this
case, press the button (C) to reset the control
equipment, and the red light will turn off.

After completing the pre-purge phase (after
about 30 seconds), the system simultaneously
opens the gas solenoid valve and activates the
transformer to discharge the electrode to ignite
the burner.

From the moment in which the burner is ignited,
the flame must be detected by the special
ionisation sensor within the specific safety time,
otherwise the control equipment enters the lock
out mode, indicated when the red led (F).

This may occur in particular in a new plant due
to air in the gas piping. In this case, wait about
one minute and reset the appliance by pressing
the "reset" button (C) to begin a new cycle.

Repeat the operation until the residual air has

Fig. 21

CONTROL PANEL

Содержание GHIBLI 4-5-6 ELITE

Страница 1: ...Technical Information GHIBLI 4 5 6 ELITE Gas fired convective air heaters GHIBLI 4 5 6 ELITE Cod 25619502IT Rev 0 20 03 2013...

Страница 2: ......

Страница 3: ...l data styling characteristics components and accessories detailed in this manual are not binding A2B ACCORRONI E G S r l reserves the right to make changes at any time that are considered necessary t...

Страница 4: ...6 1 Switching from gas in the second group to gas in the third group 20 6 2 Switching from gas in the third group to gas in the second group 20 7 OPERATING DEFECTS 21 7 1 Preliminary tests 21 7 2 Pos...

Страница 5: ...stduct 16 16 Solution with duct doubling device 16 17 Location of the doubling device in the wall 16 18 Coupling with the doubling device 16 19 Power supply cable connection 18 20 Connecting more than...

Страница 6: ...aching the CE marking shown below also guarantees that the appliance conforms with EEC directive 2006 95 Lowvoltage throughtheharmonisedstandard EN 60335 1 and EEC directive 2004 108 Electromagnetic c...

Страница 7: ...e the gas unit the room thermostat and related wiring 1 5 PACKAGE CONTENTS Theairheaterisshippedwithcardboardpacking withtwopolystyrenefoamprotectionshellswhich also contain the intake and exhaust duc...

Страница 8: ...page 6 1 8 DIMENSIONI E INGOMBRI A B C Aspir Scar Gas Ghibli 4 717 267 534 65 G 3 8 Ghibli 5 6 807 366 624 65 G 3 8 Fig 1...

Страница 9: ...V 50 Hz 8 7 6 5 4 3 2 1 18 19 M3 Al T 1 9 WIRING DIAGRAM Ghibli Model 5 Fig 3 Al External auxiliaries supply Ac Control equipment Co Fan speed switch Ea Ignition electrode Er Flame detection electrode...

Страница 10: ...ater via a switch with contact opening of at least 3 mm Observe the correct phase neutralpolarity when connecting the single phase 230 V 50 Hz power supply 1 10 TECHNICAL DATA TABLE Units Ghibli 4 Ghi...

Страница 11: ...page 9 1 11 EXPLODED VIEW Model Ghibli 4 Fig 5...

Страница 12: ...page 10 1 11 EXPLODED VIEW Models Ghibli 5 and 6 Fig 6...

Страница 13: ...lite Components missing in the design 45610038 Bronze friction bearing 45960036 Kit of gas valve connection Legend of components Ghibli 5 and 6 see fig 6 Pos Code description 01 45660001 Casing Ghibli...

Страница 14: ...r The die cast aluminium casing is equipped with 3 8 RP threaded gas inlet and outlet connections and two inlet and outlet pressure test points The gas valve is also equipped with an inlet filter fig...

Страница 15: ...cted area 3 4 DATA CHECK Check that the heater and its technical characteristics match what is indicated by the drawings or other documents The type of gas for which the heater has been designed and t...

Страница 16: ...ons constitute the definition of type according to the current standards Type C12 standard supply The combustion circuit is hermetically sealed with respect to the environment in which the air heater...

Страница 17: ...t fig 14 4 4 INSTALLATION OPERATIONS Set up the gas and electricity supply lines based on the installation design 4 4 1 Air heater wall mounting preparations appliance with standard supply Installatio...

Страница 18: ...xhaust ducts Installation Type C52 Unlike the previous solution to mount the duct doubling device a recessed housing must be created in the wall and possibly some chases to indicate the duct layout fi...

Страница 19: ...used again b mount the aluminium flange 92 mm inserting the ring gasket and attaching it on the appliance fitting using the three screws supplied with the kit Check that the ring gasket fits correctly...

Страница 20: ...terminal board of the appliances after having removed the existing bridge 5 START UP WARNING The appliance initial start up operations and tests must be performed by skilled technical personnel 5 1 TE...

Страница 21: ...he safety thermostat Then repeat the start up operation to observe and check that the burner has ignited correctly and that the flame is stable 5 3 USEFUL INFORMATION It is recommended that the user b...

Страница 22: ...uge tube into the upstream pressure inlet on the burner fig 22 after having backed off the closing screw a few turns h start the air heater according to what is indicated in point 5 2 Check that the s...

Страница 23: ...external terminal of the combustion air intake and combustion product exhaust duct is not obstructed 7 2 POSSIBLE DEFECTS The following is a list of possible defects along with their probable causes T...

Страница 24: ...electrode electric connection has been interrupted Check the electrode connection to the control equipment If the cable or ceramic insulation is damaged replace the electrode in accordance with the po...

Страница 25: ...ch the metal support block of the coils and remove it from the housing Pull out the coil s from the unit and replace them with new ones Replace the metal support block in the correct position and tigh...

Страница 26: ...g the 6 screws that were previously removed 8 7 FLUE EXHAUST FAN Disconnect the motor electrical connection and loosen the three scroll fastening screws Gently remove the motor fan unit and respecting...

Страница 27: ...Replace the burner support plate making sure that the relative gasket is in the correct position Attach the plate using the 6 screws that were previously removed Check that the external intake exhaust...

Страница 28: ...ed led will turn off If the lockoutconditioncontinues thisgenerally means that there is a fault or an operating defect Therefore it is recommended to contact a Technical Service Centre The exchanger h...

Страница 29: ...heck that the external terminal of the intake exhaust duct is not obstructed or that the relative material has deteriorated b clean the external parts of the air heater simply by using a damp cloth an...

Страница 30: ...page 28 NOTE...

Страница 31: ......

Страница 32: ...A2B ACCORRONI E G S r l Via d Ancona 37 60027 Osimo An Tel 071 723991 Fax 071 7133153 Web Site www accorroni it E mail a2b accorroni it...