Accorroni GHIBLI 4-5-6 ELITE Скачать руководство пользователя страница 17

page 15

4.2.2 Duct length limits

If the duct passes directly through the external
wall, and if that wall has a thickness of more than
40 cm, an intake/exhaust duct with a length of 1
metre can be supplied on request. If the appliance
is installed with separated ducts, using the special
accessory, the length of the ducts must not be
greater than 6 metres, considered as the sum of
the layout of both ducts (for example: 3 m intake
+ 3 m exhaust, etc.), to ensure correct operation.

It should be remembered  that a bend  is
equivalent to a straight segment of about 50 cm.
If the exhaust duct layout is exposed to low
temperatures, prevent condensation from
forming by using suitable insulation on that duct.

4.3 OUTSIDE POSITIONING OF THE FLUE
GAS EXHAUST TERMINAL

The position of the flue gas exhaust terminal and
its distance from windows, ventilation openings,
etc. must comply with what is prescribed by the
current standards.

If the air heater is installed in rooms on the ground
floor and the exhaust faces sidewalks at the level
of pedestrians, a special protection grille must be
applied, which is supplied on request 

(fig. 14).

4.4 INSTALLATION OPERATIONS

Set up the gas and electricity supply lines based
on the installation design.

4.4.1 Air heater wall-mounting preparations

(appliance with standard supply -
Installation Type C

12

)

Once the position and the height of the appliance
from the ground has been determined, use the

wall template from the cardboard packing to
indicate the positions of the holes to be made
(three holes to attach the appliance with an Ø 8
mm bit for expansion bolts, one hole for the
intake/exhaust duct with special hole cutter Ø 70
mm, to be made as perpendicular as possible to
the direction of the wall).

The template also indicates the positions of the
electric power supply cable and gas feeder pipe
entries.

4.4.2 Mounting the intake/exhaust duct

(appliance with standard supply -
Installation Type C

12

)

The intake/exhaust duct, supplied for walls up to
40 cm, consists of an aluminium pipe with
connector flange and an external terminal. Mount
the duct in the sequence described below:

Fig. 14

TERMINAL PROTECTION GRILLE

Grille

TYPE C

52 

 INSTALLATION

Fig. 13

SIDE VIEW

TOP VIEW

Using the doubling device (supplied on
request), it is possible to create different
configurations of the air intake and flue gas
exhaust ducts, within specified limits. The
external terminals are not required to be
adjacent to each other.

Содержание GHIBLI 4-5-6 ELITE

Страница 1: ...Technical Information GHIBLI 4 5 6 ELITE Gas fired convective air heaters GHIBLI 4 5 6 ELITE Cod 25619502IT Rev 0 20 03 2013...

Страница 2: ......

Страница 3: ...l data styling characteristics components and accessories detailed in this manual are not binding A2B ACCORRONI E G S r l reserves the right to make changes at any time that are considered necessary t...

Страница 4: ...6 1 Switching from gas in the second group to gas in the third group 20 6 2 Switching from gas in the third group to gas in the second group 20 7 OPERATING DEFECTS 21 7 1 Preliminary tests 21 7 2 Pos...

Страница 5: ...stduct 16 16 Solution with duct doubling device 16 17 Location of the doubling device in the wall 16 18 Coupling with the doubling device 16 19 Power supply cable connection 18 20 Connecting more than...

Страница 6: ...aching the CE marking shown below also guarantees that the appliance conforms with EEC directive 2006 95 Lowvoltage throughtheharmonisedstandard EN 60335 1 and EEC directive 2004 108 Electromagnetic c...

Страница 7: ...e the gas unit the room thermostat and related wiring 1 5 PACKAGE CONTENTS Theairheaterisshippedwithcardboardpacking withtwopolystyrenefoamprotectionshellswhich also contain the intake and exhaust duc...

Страница 8: ...page 6 1 8 DIMENSIONI E INGOMBRI A B C Aspir Scar Gas Ghibli 4 717 267 534 65 G 3 8 Ghibli 5 6 807 366 624 65 G 3 8 Fig 1...

Страница 9: ...V 50 Hz 8 7 6 5 4 3 2 1 18 19 M3 Al T 1 9 WIRING DIAGRAM Ghibli Model 5 Fig 3 Al External auxiliaries supply Ac Control equipment Co Fan speed switch Ea Ignition electrode Er Flame detection electrode...

Страница 10: ...ater via a switch with contact opening of at least 3 mm Observe the correct phase neutralpolarity when connecting the single phase 230 V 50 Hz power supply 1 10 TECHNICAL DATA TABLE Units Ghibli 4 Ghi...

Страница 11: ...page 9 1 11 EXPLODED VIEW Model Ghibli 4 Fig 5...

Страница 12: ...page 10 1 11 EXPLODED VIEW Models Ghibli 5 and 6 Fig 6...

Страница 13: ...lite Components missing in the design 45610038 Bronze friction bearing 45960036 Kit of gas valve connection Legend of components Ghibli 5 and 6 see fig 6 Pos Code description 01 45660001 Casing Ghibli...

Страница 14: ...r The die cast aluminium casing is equipped with 3 8 RP threaded gas inlet and outlet connections and two inlet and outlet pressure test points The gas valve is also equipped with an inlet filter fig...

Страница 15: ...cted area 3 4 DATA CHECK Check that the heater and its technical characteristics match what is indicated by the drawings or other documents The type of gas for which the heater has been designed and t...

Страница 16: ...ons constitute the definition of type according to the current standards Type C12 standard supply The combustion circuit is hermetically sealed with respect to the environment in which the air heater...

Страница 17: ...t fig 14 4 4 INSTALLATION OPERATIONS Set up the gas and electricity supply lines based on the installation design 4 4 1 Air heater wall mounting preparations appliance with standard supply Installatio...

Страница 18: ...xhaust ducts Installation Type C52 Unlike the previous solution to mount the duct doubling device a recessed housing must be created in the wall and possibly some chases to indicate the duct layout fi...

Страница 19: ...used again b mount the aluminium flange 92 mm inserting the ring gasket and attaching it on the appliance fitting using the three screws supplied with the kit Check that the ring gasket fits correctly...

Страница 20: ...terminal board of the appliances after having removed the existing bridge 5 START UP WARNING The appliance initial start up operations and tests must be performed by skilled technical personnel 5 1 TE...

Страница 21: ...he safety thermostat Then repeat the start up operation to observe and check that the burner has ignited correctly and that the flame is stable 5 3 USEFUL INFORMATION It is recommended that the user b...

Страница 22: ...uge tube into the upstream pressure inlet on the burner fig 22 after having backed off the closing screw a few turns h start the air heater according to what is indicated in point 5 2 Check that the s...

Страница 23: ...external terminal of the combustion air intake and combustion product exhaust duct is not obstructed 7 2 POSSIBLE DEFECTS The following is a list of possible defects along with their probable causes T...

Страница 24: ...electrode electric connection has been interrupted Check the electrode connection to the control equipment If the cable or ceramic insulation is damaged replace the electrode in accordance with the po...

Страница 25: ...ch the metal support block of the coils and remove it from the housing Pull out the coil s from the unit and replace them with new ones Replace the metal support block in the correct position and tigh...

Страница 26: ...g the 6 screws that were previously removed 8 7 FLUE EXHAUST FAN Disconnect the motor electrical connection and loosen the three scroll fastening screws Gently remove the motor fan unit and respecting...

Страница 27: ...Replace the burner support plate making sure that the relative gasket is in the correct position Attach the plate using the 6 screws that were previously removed Check that the external intake exhaust...

Страница 28: ...ed led will turn off If the lockoutconditioncontinues thisgenerally means that there is a fault or an operating defect Therefore it is recommended to contact a Technical Service Centre The exchanger h...

Страница 29: ...heck that the external terminal of the intake exhaust duct is not obstructed or that the relative material has deteriorated b clean the external parts of the air heater simply by using a damp cloth an...

Страница 30: ...page 28 NOTE...

Страница 31: ......

Страница 32: ...A2B ACCORRONI E G S r l Via d Ancona 37 60027 Osimo An Tel 071 723991 Fax 071 7133153 Web Site www accorroni it E mail a2b accorroni it...

Отзывы: