5  

 

 

1. 

Footings (Piers)

Prepare site and mark out 
positions as per the engineering 
drawings.
Dig footings then box surrounds 
to form a level flat concrete 
surface for fixing framework to.

TIP: *It is recommended that the 
concrete should be boxed 100 
mm above ground level to allow 
for a future slab.

2. 

Slab - optional

Prepare footings as noted in A.
Pour a perfectly level slab to 
the dimensions specified in the 
engineering drawings.
Alternatively you may prefer 
the slab to finish flush with the 
outside of the footings.
The slab will be 100 mm thick, 
reinforced with F72 mesh, laid 30 
mm from the top. 50 mm thick 
sand bedding on a water proof 
membrane
No edge thickening is required 
apart from the footings as 
detailed.

FOUNDATIONS

GROUND

F72 mesh with 
30 mm of top 
cover

waterproof 
membrane

50 mm sand 
bedding

SLAB

100

600

PAD FOOTING

600x600x600

600

100*

12mm 
dynabolts

GROUND

Please refer to engineering drawings that specify overall footings layout, slab and post dimensions.

Содержание GCPDN2

Страница 1: ...eds com au DOWNLOAD OUR APP FOR ASSEMBLY VIDEOS PLEASE LEAVE A REVIEW Tell us about your experience Visit www abscosheds com au review 6445 mm 6345 mm For construction in non cyclonic areas Wind ratin...

Страница 2: ...omponents may be packed inside others almost hidden Carefully examine inside each component to ensure that you have located every item If a discrepancy is found contact Absco Industries immediately Do...

Страница 3: ...IPTION PART CHK 6 TRUSS OUTER DIAGONAL 958 mm S0958 6 TRUSS OUTER INFILL 650 mm C0650 12 TRUSS INNER INFILL 850 mm C0850 12 PURLIN 2960 mm C2960 6 PURLIN JOINER 200 mm C0200 QTY DESCRIPTION PART CHK 4...

Страница 4: ...UTTER END STOP TR25 6 TRUSS SIDE JOINER PLATE 70 x 450 mm ZACO 181 10 MULTIPURPOSE BRACKET MPB BKT 17 16 COLUMN BASE BRACKET 12 mm HOLE BKT 03 3 FLY BRACE 40 x 40 x 850 mm ZACO 125 6 FLY BRACE 40 x 40...

Страница 5: ...gs as noted in A Pour a perfectly level slab to the dimensions specified in the engineering drawings Alternatively you may prefer the slab to finish flush with the outside of the footings The slab wil...

Страница 6: ...frame section to be spread over the sides of another frame section boxed frame section or H section Absco sheds frame sections are designed to nest into one another to create boxed frame sections Boxe...

Страница 7: ...vertical M0525 and make sure it is perpendicular to the bottom chord 3 Fasten all frame pieces with two wafer head tek screws per tab Use six screws per side at the end where the top chord fits insid...

Страница 8: ...d down the other and fix with 4 more screws 7 Next each side will need a larger joining plate ZACO181 and 20 screws per side Repeat these steps until you have three completed 5 8m trusses 1 Layout the...

Страница 9: ...roceed to fastening Fasten all with tek screws at 300 centres TIP The top side of the beam needs wafer head teks The underside of the beam can be hex head tek screws 3 Remove all screws for the two ou...

Страница 10: ...our faces of the column 3 Place a BKT03 and fasten with a pair of M10 x 20mm bolts nuts and washers Poke the bolt through from the inside of the post and use a nut and washer on the outside Turn over...

Страница 11: ...trusses POSTS FITTING END TRUSS TO POSTS FITTING EDGE BEAM Truss Flush Post 1 Safely lift and align the edge beam as shown It has to sit 80 mm below the post as shown Fasten to the column with 10 hex...

Страница 12: ...re they interfere with the MPBs 2 Post Angle Braces Use two ZACO232 angle braces to sandwich post and truss Fasten with 6 tek screws per end Make sure to use wafer head tek screws to outside of truss...

Страница 13: ...own This is to be bent to suit and fit to the underside of truss with two hex head tek screws Fly brace Purlin Truss underside 40 45 degrees FRAME ASSEMBLY ZACO123 ZACO124 ZACO124 ZACO125 ZACO123 5 Ro...

Страница 14: ...s Give first sheet a 20mm overhang of the end truss All sheets will overhang the edge beam by min 30mm for the gutters 2 Use Hex head tek screw with neoprene washer FAST035 at every pan to top purlin...

Страница 15: ...shing 4 You ll have four pieces That s the sheets done for the right side of a gable end Repeat the last steps with the angle going the other way to make the four left sheets 5 Repeat steps until you...

Страница 16: ...he edge beam at either end and spaced equally along the length You may adjust bracket height to allow for a slight fall to the downpipe position 8 Fit gutter onto all brackets at once Push top of brac...

Страница 17: ......

Страница 18: ......

Страница 19: ...ows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked ab...

Страница 20: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admi...

Страница 21: ...itions such as extreme heat or cold The product should only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into cont...

Отзывы: