background image

12’x10‘ Sunshelter Mural

Operators’ Manual p. XX

12pi x 10pi Abri-soleil Mural

Guide de l'utilisateur p.XX

Model/Modèle : 

999-3142990

Customer Service / Service à la clientèle : 1-866-206-0888

Our Customer service staff is available to help you. For help with product assembly, to report damaged or 

missing parts, or for any other information about this product, please call our toll-free number.

SAVE THIS MANUAL

Keep this manual and the original sales invoice in a safe, dry place for future reference.

Notre personnel du service à la clientèle est disponible pour vous aider. Pour obtenir de l’aide pour le montage 

de votre produit, pour signaler des pièces endommagées ou manquantes, ou pour toute autre information à 

proposde ce produit, veuillez composer notre numéro sans frais.

CONSERVEZ CE GUIDE

Conservez ce guide avec la facture d'origine dans un endroit sûr et sec pour référence future.

Содержание 999-3142990

Страница 1: ...his product please call our toll free number SAVE THIS MANUAL Keep this manual and the original sales invoice in a safe dry place for future reference Notre personnel du service à la clientèle est disponible pour vous aider Pour obtenir de l aide pour le montage de votre produit pour signaler des pièces endommagées ou manquantes ou pour toute autre information à proposde ce produit veuillez compos...

Страница 2: ... on wood deck and concrete patio aren t included 5 DO NOT REMOVE THE PROTECTIVE FILM ON THE POLYCARBONATE ROOF PANELS BEFORE INSTALLATION MAKE SURE TO PUT THE UV PROTECTED SIDE FACING UP IT IS A VERY IMPORTANT PROCEDURE IF NOT FOLLOWED AS DESCRIBE YOUR ROOF WILL NOT BE COVERED BY THE WARRANTY STEP 12 Maintenance If this shelter needs repairs l In case of a defective part or if a problem occurs whi...

Страница 3: ...ar Structure bar Structure bar G1 F1 F2 4 G 1 A1 A D2 Parts List Item Description Qty Illustration 1 1 2 1 4 Solidifying Bar Junction bar G2 G3 2 Column B2 Winter solidifying Column 1 Ogee E 1 Ogee E1 1 C C1 D Track Track Track Track D1 1 1 1 1 2 B3 Winter solidifying Column 1 ...

Страница 4: ...nishing end 1 1 Roof finishing bar front Roof finishing bar front I2 I1 1 Roof bar corner J 1 M1 Side finishing end 1 K2a 1 1 1 K1b K2b Roof panel Roof panel Roof panel Roof bar corner Roof finishing bar back H1 1 Roof finishing bar front I 1 N Hardware Kit Item 2 Bases Illustration Description Qty 1 Roof finishing bar back H ...

Страница 5: ...ron angle 12 P1 Q 6 Iron angle Finishing end 1 Q1 Finishing end 1 O N2 Iron angle 2 2 Bases Screws and nuts Screws and nuts Screws and nuts Y Y1 12 12 X 32 M6 x 15 Screws and nuts Screws and nuts Screws and nuts Allen key 1 Z2 Item Illustration Description Qty Z 1 Wrench N1 4 Anchoring support 3 S1 Mosquito netting ...

Страница 6: ...screws U Install columns A A1 on bases N using screws V Make sure that the rim of the bases N faces the front of the columns Install columns B on bases N2 using screws V Step 1 A A1 B B N1 U B V N2 A A1 N V 1 1 1 1 1 2 2 2 3 3 3 x1 A1 x1 A x2 B x2 N x4 N1 x2 N2 ...

Страница 7: ...f the tracks D D1 Insert the junction bar D2 half way into the track D and insert screws V Insert the other half of the junction bar D2 into the track D1 and insert screws V Make sure that the screws are tightened x1 x1 x1 x1 C C1 D D1 x1 D2 D1 D D2 3 1 C C1 Rx7 2 D D1 3 D2 V 1 2 Rx12 Rx12 1 Rx7 2 ...

Страница 8: ...nsert the other half of the junction bars F2 into the track G1 and insert screws V Make sure that the screws are tightened Insert the junction bar G3 half way into the solidifying bars G2 and insert screws V Insert the other half of the junction bar G3 into the solidifying bars G2 and insert screws V Make sure that the screws are tightened Repeat with other solidifying bars G2 Step 3 7 F F1 F2 F2 ...

Страница 9: ...2 columns B using screws X Install the complete structure bar F F1 between columns A A1 using screws X Install track C between columns A B and track C1 between columns A1 B using screws X Step 4 8 F1 F D D1 C C1 A A1 B B 1 1 2 2 3 3 1 2 3 X X X X ...

Страница 10: ... Install iron angle O on the tracks C C1 using screws V Install structure bars G G1 onto iron angles O using screws V Step 5 9 G G1 O x2 V O ...

Страница 11: ...1 on each end of structure bars D D1 F F1 G G1 using screws V Install roof bars J J1 using screws V iron angle P1 previously installed Use nuts Y for short pre inserted screws The longer pre inserted screws will be used to install solidifying bars in a future step step 9 J x1 J1 x1 P1 x6 ...

Страница 12: ... K1a K2a on tracks J Install panels K1b K2b on tracks J1 Step 7 11 K1a K2a K1b K2b J J1 K1a K1a x1 K2a x1 K1b x1 K2b x1 One side of the roof panels is UV protected Make sure the sun protected side faces the sun light ...

Страница 13: ... Install ogee E on tracks C using screw T Install ogee E1 on tracks C1 using screw T Step 8 12 E x1 E1 x1 E E1 T D E T ...

Страница 14: ...ucture bars C C1 F F1 G G1 using screws V Screw roof bars J2 one at a time using iron angles P and screws V To screw on the structure bar G G1 use the short pre inserted screw in the roof bar with nuts Y1 The longer pre inserted screws will be used to install solidifying bars in a future step step 9 ...

Страница 15: ...p 10 Install solidifying bars G2 using the longer pre inserted screws and nuts Y Make sure that the solidifying bars are well centered before tightening nuts Y 14 1 1 1 1 1 1 1 1 1 1 1 1 G2 G2 G2 G2 1 Y G2 ...

Страница 16: ... Install roof finishing bars H H1 using screws V Step 11 15 1 1 2 2 2 2 H1 H 1 2 V H V H H1 H x1 H1 x1 ...

Страница 17: ... Install side finishing bars M M1 using screws V Step 12 16 M M1 M V V M x1 M1 x1 ...

Страница 18: ...s is UV protected Make sure the sun protected side faces the sun light L L x5 K x10 Slide one panel K in upper track of roof bar Then slide roof support bar L Then slide one panel K in lower track of the roof bar K K K K K K K K K K L L L L L ...

Страница 19: ... J J1 J2 W Q Y1 I Q2 Y1 W W Q1 Y1 I1 W Insert 1 screw W in each roof bars and place roof side bar I left end of the shelter I1 right end of the shelter and I2 in middle section Place finishing ends Q left end Q1 right end and Q2 on each screws remaining Secure with nuts Y1 ...

Страница 20: ... s hooks R Install mosquito netting S on inner track s hooks R Make sure the corner of the mosquito net and the curtains matches with columns B Wrap Velcro band on mosquito netting around columns B Step 15 19 MADE IN CHINA S X3 T X3 T S ...

Страница 21: ... Install winter kit bars B2 B3 under the respective cross beams before the winter season in order to solidify the roof due to heavy snow 20 Step 16 B2 x1 B3 x1 MADE IN CHINA B2 B3 ...

Страница 22: ...the surface your product will be installed upon Make sure that the shelter in well levelled and square Install the screws is the pre drilled holes of the bases N N1 of the shelter Screws are not included This step is mandatory for the warranty to apply since this is a permanent structure 21 MADE IN CHINA ...

Отзывы: