background image

14 

������������ ���� ���������� ������������

ABS lifting station Sanimat

C�mm����������

m

  The safety hints in the previous sections must be observed!

Before commissioning the unit should be checked and a functional test carried out. Particular attention should 

be paid to the following:

Have the electrical connections been carried out in accordance with regulations?
Is the direction of rotation correct - even if run via an emergency generator?
Was the control line (plastic hose) laid in such a manner that it has a continuous rise?
Was the collection tank secured against floating?
Has venting been installed in accordance with the regulations?

ATTENTION 

Before commissioning the collection tank should be cleaned of any large particles 

and filled with water.  If the control line (plastic hose) was connected to the 

submerged tube with the tank already full, then the collection tank must be fully 

emptied once by activation of the selector switch “Hand”.  After commissioning the 

faecal lifting station is normally operated with the selector switch in position “Auto”.

M����������

c

  Before commencing any maintenance work the unit should be completely disconnected from the 

mains by a qualified person and care should be taken that it cannot be inadvertently switched back on.

m

  When carrying out any repair or maintenance work, the safety regulations covering work in enclosed 

areas of sewage installations as well as good general technical pratices should be followed.

NOTE 

The maintenance hints given here are not designed for “do-it-yourself” repairs as 

special technical knowledge is required.

NOTE 

A maintenance contract with our works service department will guarantee you the 

best technical service under all circumstances.

6.1 

C�mm�����y �� m���������� �f L�f����� S������� �� ����������� w��h EN 1056.

It is recommended that the lifting station be inspected monthly and its function checked.
In accordance with EN regulations, the lifting station should be maintained by a qualified person at the following 

intervals:

in commercial premises - every three months.
in apartment blocks - every six months.
in a single family home - once a year.

In addition we recommend that a maintenance contract be taken out with a qualified company.

-
-
-
-
-

-
-
-
-

Содержание Sanimat 1501S

Страница 1: ...www absgroup com ABS lifting station Sanimat 1030 00 15970299GB 10 2006 Installation and Operating Instructions GB...

Страница 2: ...4 Discharge Line 8 4 5 Installation of the submersible pump 9 4 5 1 Mounting of the volute support 9 4 5 2 Installation of the pump head support 9 4 6 Level Control 10 4 7 Installation of the control...

Страница 3: ...12056 1 2 Technical Data Maximum noise level 70 dB 1 3 Nameplate We recommend that you record the data from the original nameplate on the nameplate illustration below and maintain it together with you...

Страница 4: ...sible pump is noise absorbing Volute support Inspection opening above Sanimat 3701 2 off Inflow ports DN 100 150 Controls Control line for the level control Vent port Inflow ports ON 100 150 height 70...

Страница 5: ...ttom plate with waved shearing inlet open ABS channel type impeller and volute All hydraulic parts have been manufactured from Cast Iron GG 25 The sewage entering by the inlet port is collected in the...

Страница 6: ...d 1 Vent Pipe DN 70 above roof level 12 Hand membrane pump connection 2 Control unit with level control system 13 Backwash loop with lowest point above the backwash level 3 Power supply 14 Discharge l...

Страница 7: ...terials The inlet lines must be laid in such a manner that there is a continuous fall of the prescribed magnitude to the inlet ports of the collection tank NOTE When installing lifting stations the no...

Страница 8: ...be installed in compliance with the relevant regulations DIN 1986 100 and EN 12056 applies in particular to the following The discharge line should be fitted with a backwash loop 180 bend located abov...

Страница 9: ...onnection 8 with clamp 7 to the pump connection port of the collection tank 1 Press the volute support 6 into the flexible connector 8 and mark the position of the volute support 6 on the floor Remove...

Страница 10: ...S S17 S26 Place the vibration damper 6 at the pump head support Screw the pump head support 5 into the pump head using socket head screw 4 Adjust the vibration damper 6 in such a manner that the rubbe...

Страница 11: ...fferent control box models exist Please check the wiring diagram instruction manual in the control box 4 8 Electrical Connection c Before commissioning an expert should check that one of the necessary...

Страница 12: ...iring with Temperature Limiter Figure 13 Single Phase Wiring with Temperature Limiter 1015 00 1018 00 Figure 14 Three Phase Wiring with Temperature Limiter DI Figure 15 Single Phase Wiring with Temper...

Страница 13: ...es 4 11 Installation of the accessories 4 11 1 Installation of the Hand Membrane Pump wall mounted 1086 00 Figure 17 Installation of hand membrane pump ATTENTION The discharge line 1 from the hand mem...

Страница 14: ...rated with the selector switch in position Auto 6 Maintenance c Before commencing any maintenance work the unit should be completely disconnected from the mains by a qualified person and care should b...

Страница 15: ...gular inspection and care is recommended to ensure a long service life NOTE The ABS service organisation would be pleased to advise you on any applications you may have and to assist you in solving yo...

Страница 16: ...ABS Production Wexford Ltd Clonard Road Wexford Ireland Tel 353 53 91 63 200 Fax 353 53 91 42335 www absgroup com...

Отзывы: