![ABB TZIDC-200 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/abb/tzidc-200/tzidc-200_operating-instructions-manual_5476016.webp)
Mounting
16 TZIDC-200,
TZIDC-210, TZIDC-220
42/18-85-EN
Procedure:
1. Attaching follower guide to actuator
Fig. 6
IMPORTANT (NOTE)
Hand tighten the screws.
• Attach the follower guide (1) and clamp plates (2) with screws (4) and spring washers (3) to
the actuator stem.
2. Assemble the lever (unless preassembled)
Fig. 7
• Insert spring (8) on bolt with follower pin (9).
• Slip the plastic washer (7) onto the bolt and compress the spring with it.
• Insert the bolt with compressed spring into the oblong hole in the lever (6) and fasten it in the
desired position using the plain washer (5) and nut (4) at the lever. The scale on the lever
indicates the link point for the stroke range.
• Place the washer (2) on the screw (1). Insert the screw in the lever and lock with the nut (3).