![background image](http://html1.mh-extra.com/html/abb/tzidc-200/tzidc-200_commissioning-instructions_3459559014.webp)
Mounting
12 - EN
TZIDC-200, TZIDC-210, TZIDC-220 CI/TZIDC-200/210/220-EN
Procedure:
1. Attach follower guide to actuator
Fig. 5
Important
Hand tighten the screws.
• Attach the follower guide (1) and clamp plates (2) with screws (4) and spring washers (3) to
the actuator stem.
2. Assemble the lever (unless preassembled)
Fig. 6
• Insert spring (8) on bolt with follower pin (9).
• Slip the plastic washer (7) onto the bolt and compress the spring with it.
• Insert the bolt with compressed spring into the oblong hole in the lever (6) and fasten it in the
desired position using the plain washer (5) and nut (6) at the lever. The scale on the lever
indicates the link point for the stroke range.
• Place the washer (2) on the screw (1). Insert the screw in the lever and lock with the nut (3).
Содержание TZIDC-200
Страница 2: ......
Страница 33: ...Ex relevant specifications CI TZIDC 200 210 220 EN TZIDC 200 TZIDC 210 TZIDC 220 EN 31...