background image

C

I/

R

V

G

20

0

/0

0

1-

E

N R

ev

. A

 

12

.2

0

17


ABB Limited 
Measurement & Analytics

 

Howard Road  
St. Neots 
Cambridgeshire  
PE19 8EU 
UK 
Tel: +44 (0)870 600 6122 
Fax: +44 (0)1480 213 339 
Mail: [email protected]

ABB Inc. 
Measurement & Analytics

 

125 E. County Line Road 
Warminster  
PA 18974 
USA 
Tel: +1 215 674 6000 
Fax: +1 215 674 7183

abb.com/measurement

We reserve the right to make technical changes or modify the contents of this document 
without prior notice. With regard to purchase orders, the agreed particulars shall prevail. 
ABB does not accept any responsibility whatsoever for potential errors or possible lack of 
information in this document.
We reserve all rights in this document and in the subject matter and illustrations contained 
therein. Any reproduction, disclosure to third parties or utilization of its contents – in 
whole or in parts – is forbidden without prior written consent of ABB.
© ABB 2017

Содержание ScreenMaster RVG200

Страница 1: ...s and fuse requirements 4 Navigation navigating the user interface quickly and effectively 5 Menus overview menu familiarization 6 Basic setup steps required for first time use 7 Symbols and icons a s...

Страница 2: ...easurement Control and Laboratory Use and complies with US NEC 500 NIST and OSHA Safety conventions WARNING In this manual a warning is used to indicate a condition which if not met could cause seriou...

Страница 3: ...ted to the installation of firewalls application of authentication measures encryption of data installation of anti virus programs etc to protect the product the network its system and the interface a...

Страница 4: ...0 RVG200 RVG200 RVG200 Ambient temperature 50 C 122 F Max 0 C 32 F Min Eye level location Humidity 5 to 95 Avoid vibration Figure 1 Locating the recorder 2 Panel mounting the recorder Referring to Fig...

Страница 5: ...rm to either IEC 60227 or IEC 60245 The terminals accept cables from 0 8 to 2 5 mm2 18 to 14 AWG The recorder conforms to Installation Category II of IEC 61010 All connections to secondary circuits mu...

Страница 6: ...igure 4 1 Make connections to the power supply terminals module position E as follows AC supply terminals 1 line 2 neutral 3 ground or DC supply terminals 4 5 IMPORTANT NOTE Tighten terminal screws to...

Страница 7: ...old junction assembly fitted Inputs 1 to 6 RTD R THC Volt free digital input mV V ma digital input V A B C D Analog Input A B C D Relay C D Hybrid E Power supply RJ45 USB 100 to 240 V AC 24 V DC Input...

Страница 8: ...lay Operator menu icons page 2 of 2 Exit Operator menus return to previous view Display associated menus Access dialog Accept settings Exit display Figure 7 Navigating menus Navigating groups and view...

Страница 9: ...or Log view Recorder functions are accessed by pressing the icon associated with the required function Select Group Operator Message Screen Capture Auto Group Scroll Trace Select Start Batch Select Vi...

Страница 10: ...nal storage media c Create a new configuration based on the instrument s default configuration System Configuration Common Functions Groups Logic Editor Channels Maths equations I O Configuration menu...

Страница 11: ...Points Menu enables Bar Bar graph view enable Bar graph markers Menu enables Batch if option enabled Enable Batch Recording Start Stop Abort Operator Login Batch Number Field 1 3 Title Channels Setup...

Страница 12: ...P Implementation Slave Modbus TCP Port Reverse IEEE Data Implementation Master Modbus TCP Port Poll Rate Poll fail limit Response Timeout Client Authorization TCP TCP Client Access Authorized IP 1 6 C...

Страница 13: ...rn to the Common Configuration level Time menu options Setup Groups and Channel allocation 1 Press the Setup tab and at the Number of Groups field press and enter the number of Groups required Press t...

Страница 14: ...O page displaying fitted I O modules IMPORTANT NOTE I O modules are detected automatically 2 Press the icon associated with the required module to display the dialog and fields associated with that m...

Страница 15: ...Active Alarm event icons Totalizer icons Audit log icons High process alarm Low process alarm Delayed high process alarm Delayed low process alarm High latch alarm Low latch alarm Fast rate alarm Slow...

Страница 16: ...right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility...

Отзывы: