background image

SCR E E N M A STE R RVG 20 0 / PA PE R LE SS R ECOR DE R

  |  C I/R VG 2 0 0/0 01- EN R E V. A

15

Symbols and icons

6        

2

3         

4         

5        

6         

6

5

3

2

4

           

Sales

Service

Software

Process Group name

Process Group 

1 to 6

Configuration

Channel 

1.1 – 1.6

to 

6.1 – 6.6

Configuration

Common Configuration 

Functions Configuration

I/O Module Configuration

Status icons

Historical review active 

 

External archive media online (green icon, number indicates % used) 

– 

do not remove external media while online

 

External archive media offline (grey icon)

External media 100 % full, archiving stopped (green icon, flashing red cross)

Alarm(s) active, red flashing border indicates unacknowledged alarm(s) active 

AutoView scroll active

 

Clock battery failure

Inactive  Active

Alarm event icons

Totalizer icons

Audit log icons

High process alarm

Low process alarm

Delayed high process alarm

Delayed low process alarm

High latch alarm

Low latch alarm

Fast rate alarm

Slow rate alarm

High annunciate alarm

Low annunciate alarm

Real-time alarm

Alarm acknowledged

Operator message

Daylight saving start / end changed

Electronic Signature

Totalizer started

Totalizer stopped

Totalizer wrapped

Totalizer reset

Intermediate value reached

Timed event

Triggered event

Power failed

Power restored

Batch total

Maximum value

Minimum value

Average value

Daylight saving start / end changed

Power failed

Power restored

Calibration change

Configuration change

File deleted

Archive media inserted

Archive media removed

Archive media offline

Archive media online

Archive media full

System error / reset archiving

Daylight time or daylight 

saving start end changed

FTP Logon

Содержание ScreenMaster RVG200

Страница 1: ...s and fuse requirements 4 Navigation navigating the user interface quickly and effectively 5 Menus overview menu familiarization 6 Basic setup steps required for first time use 7 Symbols and icons a s...

Страница 2: ...easurement Control and Laboratory Use and complies with US NEC 500 NIST and OSHA Safety conventions WARNING In this manual a warning is used to indicate a condition which if not met could cause seriou...

Страница 3: ...ted to the installation of firewalls application of authentication measures encryption of data installation of anti virus programs etc to protect the product the network its system and the interface a...

Страница 4: ...0 RVG200 RVG200 RVG200 Ambient temperature 50 C 122 F Max 0 C 32 F Min Eye level location Humidity 5 to 95 Avoid vibration Figure 1 Locating the recorder 2 Panel mounting the recorder Referring to Fig...

Страница 5: ...rm to either IEC 60227 or IEC 60245 The terminals accept cables from 0 8 to 2 5 mm2 18 to 14 AWG The recorder conforms to Installation Category II of IEC 61010 All connections to secondary circuits mu...

Страница 6: ...igure 4 1 Make connections to the power supply terminals module position E as follows AC supply terminals 1 line 2 neutral 3 ground or DC supply terminals 4 5 IMPORTANT NOTE Tighten terminal screws to...

Страница 7: ...old junction assembly fitted Inputs 1 to 6 RTD R THC Volt free digital input mV V ma digital input V A B C D Analog Input A B C D Relay C D Hybrid E Power supply RJ45 USB 100 to 240 V AC 24 V DC Input...

Страница 8: ...lay Operator menu icons page 2 of 2 Exit Operator menus return to previous view Display associated menus Access dialog Accept settings Exit display Figure 7 Navigating menus Navigating groups and view...

Страница 9: ...or Log view Recorder functions are accessed by pressing the icon associated with the required function Select Group Operator Message Screen Capture Auto Group Scroll Trace Select Start Batch Select Vi...

Страница 10: ...nal storage media c Create a new configuration based on the instrument s default configuration System Configuration Common Functions Groups Logic Editor Channels Maths equations I O Configuration menu...

Страница 11: ...Points Menu enables Bar Bar graph view enable Bar graph markers Menu enables Batch if option enabled Enable Batch Recording Start Stop Abort Operator Login Batch Number Field 1 3 Title Channels Setup...

Страница 12: ...P Implementation Slave Modbus TCP Port Reverse IEEE Data Implementation Master Modbus TCP Port Poll Rate Poll fail limit Response Timeout Client Authorization TCP TCP Client Access Authorized IP 1 6 C...

Страница 13: ...rn to the Common Configuration level Time menu options Setup Groups and Channel allocation 1 Press the Setup tab and at the Number of Groups field press and enter the number of Groups required Press t...

Страница 14: ...O page displaying fitted I O modules IMPORTANT NOTE I O modules are detected automatically 2 Press the icon associated with the required module to display the dialog and fields associated with that m...

Страница 15: ...Active Alarm event icons Totalizer icons Audit log icons High process alarm Low process alarm Delayed high process alarm Delayed low process alarm High latch alarm Low latch alarm Fast rate alarm Slow...

Страница 16: ...right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility...

Отзывы: