
20 SafeRing/SafePlus 36kV
| Installation and operating instruction
5. If a fuse-link is already installed but has to be
replaced, pull it out.
6. Fix the new fuse-link to the fuse cover by means
of the contact screw.
Note! the striker pin must point towards the fuse
cover.
7. Insert the fuse-link into fuse canister..
8. Press the handle and close the fuse canister.
9. Fix the front cover. The switch-fuse
combination is ready for operation.