![ABB Relion SAM600 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/abb/relion-sam600/relion-sam600_installation-manual_3045258025.webp)
PosNo
Description
Quantity
Type
1
Washer
8
M4
2
Screw
8
M4x6
3
Mounting profiles
2
-
4
Nut
6
M6
5
Spacer
4
-
6
Mounting angles
2
-
5.3.3
Side-by-side 19” rack mounting
IP10323-1 v1
5.3.3.1
Overview
M11974-3 v3
IED case size 1/2 x 19” and RHGS cases can be mounted side-by-side up to a maximum size of
19”. For side-by-side rack mounting, the side-by-side mounting kit together with the 19” rack
panel mounting kit must be used. The mounting kit has to be ordered separately.
Use only the screws included in the mounting kit when mounting the plates and
the angles on the IED. Screws with wrong dimension may damage the PCBs
inside the IED.
5.3.3.2
Mounting procedure for side-by-side rack mounting
M11955-2 v4
IEC17000121-1-en.vsdx
1
2
3
4
3
IEC17000121 V1 EN-US
Figure 5:
Side-by-side rack mounting details.
The required torque for the screws is 3.5 Nm.
1MRK 514 030-UEN B
Section 5
Mounting
Switchgear control unit SAM600-IO
19
Installation manual
© Copyright 2017 ABB. All rights reserved