5.3.1.2
Mounting procedure for 19” panel rack mounting
M11948-2 v7
1a
IEC17000120-1-en.vsdx
1a
2
3
IEC17000120 V1 EN-US
Figure 3:
19” panel rack mounting details
The required torque for the screws is 3.5 Nm.
PosNo
Description
Quantity
Type
1a, 1b
Mounting angles, can be mounted
either to the left or the right side of
the case
2
-
2
Screw
8
M4x6
3
Washer
8
M4x6
1MRK 514 030-UEN B
Section 5
Mounting
Switchgear control unit SAM600-IO
17
Installation manual
© Copyright 2017 ABB. All rights reserved