5
6
1
4
1
1
1
3
2
GUID-D86C1230-8BB6-443D-AF3E-2F3D298CBEDA V1 EN
Figure 6:
Flush mounting kit details
1 6-32 × 3/8 Flat Hd Philips Mach Screw, 82°, 18-8 SS, B18.6.3 8
2 Mounting panel
3 #10, Lock washer, medium split, SSTL, ANSI B18.21.1
6
4 10-32 Hex nut, UNC, SSTL, ANSI B18.6.3
6
5 Panel mount bezel
1
6 Bezel gasket ABB #613641
1
Requirements for installation:
•
Panel cut-out and holes for mounting screws as shown in
•
For flush mounting, depth behind the panel should be about 9 inches (228.6 mm). Add
about 2 inches space for wire, cable duct and so on.
•
It should be possible to add or replace the flush mounted IED without excessive
dismantling.
When space at the rear is a constrain, check if semi-flush mounting can be adopted.
1MRS240046-IB B
Section 4
Mounting
REF615R
17
Installation Manual