Completing the test..............................................................168
Four step phase overcurrent protection OC4PTOC..................168
Verifying the settings............................................................168
Completing the test..............................................................170
Instantaneous residual overcurrent protection EFPIOC ...........170
Four step residual overcurrent protection EF4PTOC ...............170
Four step directional earth fault protection...........................171
Four step non-directional earth fault protection....................171
Completing the test..............................................................172
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................172
Completing the test..............................................................173
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................173
Measuring the operate and time limit for set values.............174
Completing the test..............................................................179
Thermal overload protection, two time constants TRPTTR ......179
Checking operate and reset values......................................179
Completing the test..............................................................180
Breaker failure protection CCRBRF..........................................180
Checking the phase current operate value,
Checking the residual (earth fault) current operate value
IN> set below IP>.................................................................181
Checking the re-trip and back-up times................................181
Verifying the re-trip mode.....................................................181
Verifying the back-up trip mode............................................182
Verifying instantaneous back-up trip at CB faulty
RetripMode = Contact.............................183
Current&Contact......................184
Completing the test..............................................................185
Pole discordance protection CCRPLD......................................185
Verifying the settings............................................................185
Completing the test..............................................................186
Directional underpower protection GUPPDUP .........................186
Verifying the settings............................................................186
Completing the test..............................................................188
Directional overpower protection GOPPDOP ...........................188
Verifying the settings............................................................188
Completing the test..............................................................189
Negative-sequence time overcurrent protection for
machines NS2PTOC ................................................................189
Table of contents
6
Installation and commissioning manual
Содержание Relion 670 series
Страница 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Страница 2: ......
Страница 16: ...10...
Страница 24: ...18...
Страница 26: ...20...
Страница 28: ...22...
Страница 92: ...86...
Страница 96: ...90...
Страница 102: ...96...
Страница 108: ...102...
Страница 112: ...106...
Страница 126: ...120...
Страница 140: ...134...
Страница 150: ...144...
Страница 234: ...228...
Страница 238: ...232...
Страница 250: ...244...
Страница 259: ...253...