Checking optical connections........................................................... 53
Section 5 Configuring the IED and changing settings....................55
Overview...........................................................................................55
Configuring analog CT inputs........................................................... 56
Reconfiguring the IED...................................................................... 56
Section 6 Establishing connection and verifying the SPA/IEC
communication............................................................... 59
Entering settings...............................................................................59
Verifying the communication............................................................ 60
Section 7 Establishing connection and verifying the LON
communication............................................................... 63
Communication via the rear ports ....................................................63
LON communication....................................................................63
The LON Protocol........................................................................64
Hardware and software modules.................................................64
Optical budget calculation for serial communication with LON ........66
Section 8 Establishing connection and verifying the IEC 61850
communication............................................................... 67
Overview...........................................................................................67
Setting the station communication....................................................67
Verifying the communication............................................................ 68
Section 9 Testing IED operation.....................................................69
Preparing for test.............................................................................. 69
Requirements.............................................................................. 69
Preparing the IED to verify settings.............................................71
Activating the test mode................................................................... 72
Preparing the connection to the test equipment............................... 72
Connecting the test equipment to the IED........................................73
Releasing the function to be tested.................................................. 74
Verifying analog primary and secondary measurement................... 75
Testing the protection functionality................................................... 76
Forcing of binary I/O signals for testing............................................ 77
Table of contents
2
Line distance protection REL670 2.1 IEC
Commissioning manual
Содержание Relion 670 Series REL670
Страница 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 30: ...24 ...
Страница 34: ...28 ...
Страница 64: ...58 ...
Страница 68: ...62 ...
Страница 90: ...84 ...
Страница 254: ...248 ...
Страница 260: ...254 ...
Страница 269: ...263 ...