The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for the monitoring,
controlling and setting of the IED. The manual also describes how to identify
disturbances and how to view calculated and measured power grid data to
determine the cause of a fault.
1.1.1
Presumptions for Technical Data
GUID-1E949E38-E04D-4374-A086-912C25E9F93C v2
The technical data stated in this document are only valid under the following
circumstances:
1. Main current transformers with 1 A or 2 A secondary rating are wired to the
IED 1 A rated CT inputs.
2. Main current transformer with 5 A secondary rating are wired to the IED 5 A
rated CT inputs.
3. CT and VT ratios in the IED are set in accordance with the associated main
instrument transformers. Note that for functions which measure an analogue
signal which do not have corresponding primary quantity the 1:1 ratio shall be
set for the used analogue inputs on the IED. Example of such functions are:
HZPDIF, ROTIPHIZ and STTIPHIZ.
4. Parameter
IBase
used by the tested function is set equal to the rated CT
primary current.
5. Parameter
UBase
used by the tested function is set equal to the rated primary
phase-to-phase voltage.
6. Parameter
SBase
used by the tested function is set equal to:
•
√3 ×
IBase
×
UBase
7. The rated secondary quantities have the following values:
•
Rated secondary phase current I
r
is either 1 A or 5 A depending on
selected TRM.
•
Rated secondary phase-to-phase voltage U
r
is within the range from 100
V to 120 V.
•
Rated secondary power for three-phase system S
r
= √3 × U
r
× I
r
8. For operate and reset time testing, the default setting values of the function are
used if not explicitly stated otherwise.
9. During testing, signals with rated frequency have been injected if not explicitly
stated otherwise.