Values of the logical signals for PHPIOC are available on the local HMI under Main menu/
Tests/Function status/Current protection/InstPhaseOverCurrent(50,3I>>)/
PHPIOC(50;3I>>):x, where x = 1, 2, and 3.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
To verify the settings the following fault type should be tested:
•
Phase-to-earth fault
Ensure that the maximum continuous current, supplied from the current source used for the
test of the IED, does not exceed four times the rated current value of the IED.
9.3.1.1
Measuring the operate limit of set values
M11754-11 v7
1.
Set the operation mode to
1 out of 3.
2.
Inject a phase current into the IED with an initial value below the set value of
IP>> and
also make sure that the set value
IP>> is in between IP>>Min and IP>>Max.
3.
Increase the injected current in the Ln phase until the TRLn (n=1–3) signal appears.
4.
Switch the fault current off.
Observe: Do not exceed the maximum permitted overloading of the
current circuits in the IED.
5.
Compare the measured operating current with the set value.
6.
Set the operation mode to
2 out of 3 and inject current into one of the phases and then
check that no TRLn signal appears.
9.3.1.2
Completing the test
M11754-24 v5
continue to test another function or end the test by changing the
TESTMODE setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
9.3.2
Directional phase overcurrent protection, four steps OC4PTOC
SEMOD56287-67 v9
Prepare the IED for verification of settings outlined in Section
Values of the logical signals for OC4PTOC are available on the local HMI under Main menu/
Tests/Function status/Current protection/PhaseOverCurrent4Step(51_67,4(3I>))/
OC4PTOC(51_67;4(3I>)):x, where x = instance number.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
9.3.2.1
Verifying the settings
SEMOD56287-72 v10
The verification of the non-directional phase overcurrent function is done as
instructed below, but without applying any polarizing voltage.
1MRK 505 385-UEN C
Section 9
Testing functionality by secondary injection
Breaker protection REQ650
61
Commissioning manual
© Copyright 2017 ABB. All rights reserved
Содержание RELION 650 SERIES
Страница 1: ...Relion 650 SERIES Breaker protection REQ650 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 20: ...14...
Страница 24: ...18...
Страница 32: ...26...
Страница 42: ...36...
Страница 48: ...42...
Страница 52: ...46...
Страница 64: ...58...
Страница 118: ...112...
Страница 126: ...120...
Страница 127: ...121...