7.
Similarly check after each 1 minute whether the calculated integrated energy value and
EAFACC
and
ERFACC
outputs are matching.
8. After some time (multiple of minute) remove the current and voltage input from CVMMXN
function block.
9. Check the
EAFACC
and
ERFACC
output in the next 1 minute cycle for the retaining the same
value.
10. Activate
STOPACC
input after some time and supply the IED with same current and
voltage.
11. Check that the
ACCINPRG
signal disappears immediately and
EAFACC
and
ERFACC
outputs
also stop updating.
12. Similarly the testing can be done for
EAFACC
and
ERFACC
outputs by changing the power
inputs directions through direction settings.
Verification of MAXPAFD & MAXPRFD outputs
1.
Repeat the above test steps 1 to 2.
2.
Set
tEnergy setting as 1 minute and supply the IED with three-phase currents and voltages
at their rated value till 1 minute.
3.
Check the
MAXPAFD
and
MAXPRFD
outputs after 1 minute and compare it with last 1 minute
average power values.
4. Increase either three-phase current or voltage above the last 1 minute value.
5. After 1 minute check the
MAXPAFD
and
MAXPRFD
whether it is showing the last 1 minute
average power value as maximum.
6. Next 1 minute cycle reduce the current or voltage below previous value.
7.
Check after 1 minute whether the
MAXPAFD
and
MAXPRFD
outputs are retaining the old
maximum value.
8. Similarly the testing can be done for
MAXPAFD
and
MAXPRFD
outputs by changing the
power inputs directions through direction settings.
Verification of EAFALM & ERFALM outputs
1.
Repeat the above test steps 1 to 2.
2.
Set
tEnergy setting as 1 minute and supply the IED with three-phase currents and voltages
at their rated value till 1 minute.
3.
Ensure that the active and reactive energy values are less than the
EALim and ERLim
setting default values respectively.
4. Check that
EAFALM
and
ERFALM
are low.
5. Increase the supply currents or voltage in next 1 minute cycle such that the active or
reactive energy values are greater than the
EALim and ERLim setting default values
respectively.
6. Check that
EAFALM
and
ERFALM
are high after 1 minute.
7.
Similarly the testing can be done for
EARALM
and
ERRALM
outputs by changing the power
inputs directions through direction settings.
9.9.2.2
Completing the test
M13906-301 v5
continue to test another function or end the test by changing the
TESTMODE setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Section 9
1MRK 505 385-UEN C
Testing functionality by secondary injection
98
Breaker protection REQ650
Commissioning manual
© Copyright 2017 ABB. All rights reserved
Содержание RELION 650 SERIES
Страница 1: ...Relion 650 SERIES Breaker protection REQ650 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 20: ...14...
Страница 24: ...18...
Страница 32: ...26...
Страница 42: ...36...
Страница 48: ...42...
Страница 52: ...46...
Страница 64: ...58...
Страница 118: ...112...
Страница 126: ...120...
Страница 127: ...121...