82
Breaker failure protection (BFP)
&KDSWHU
9HULI\LQJVHWWLQJVE\VHFRQGDU\
LQMHFWLRQ
%UHDNHUIDLOXUHSURWHFWLRQ%)3
Prepare the terminal for verification of settings as outlined in section “Preparing for
test” in this chapter.
Consider to release used start criteria. The trip is a pulse with a length of 150 ms. Fault
condition: the current in a phase must exceed the set IP> as latest within the set t1 time
after the START/STLN input is activated.
To verify the settings the following fault type should be tested:
•
One for a phase-to-earth fault
The breaker-failure protection should be tested in co-operation with some other func-
tions, and in particular with the protection and trip functions or via external start.
9HULI\LQJWKHVHWWLQJV
3URFHGXUH
$SSO\WKHIDXOWFRQGLWLRQZLWKDFXUUHQWEHORZVHW,3!
5HSHDWWKHIDXOWFRQGLWLRQDQGLQFUHDVHWKHFXUUHQWLQVWHSXQ
WLOWULSDSSHDUV
&RPSDUHWKHUHVXOWZLWKWKHVHW,3!
Note: If no I> check is set only back-up trip operate at set IP>.
9HULI\LQJWKHUHWULSVHWWLQJ
Choose one of the test cases in
4.2 "Verifying the retrip setting"
according to valid set-
ting.
&KHFNLQJWKHUHWULSIXQFWLRQZLWKUHWULSVHWWRRII
3URFHGXUH
6HW5HWULS7\SH 5HWULS2II
$SSO\WKHIDXOWFRQGLWLRQZLWKFXUUHQWRYHUWKHVHWYDOXH
9HULI\WKDWUHWULSLQSKDVH/LVQRWDFKLHYHG
&KHFNLQJWKHUHWULSIXQFWLRQZLWKFXUUHQWFKHFN
3URFHGXUH
6HW5HWULS7\SH ,!FKHFN
Содержание REL 531
Страница 16: ...10 Note signs KDSWHU 6DIHW LQIRUPDWLRQ ...
Страница 44: ...38 Checking the binary I O circuits KDSWHU KHFNLQJ WKH H WHUQDO FLUFXLWU ...
Страница 52: ...46 Checking the self supervision signals KDSWHU QHUJLVLQJ WKH WHUPLQDO ...
Страница 132: ...126 Two step time delayed phase overcurrent protection TOC2 KDSWHU 9HULI LQJ VHWWLQJV E VHFRQGDU LQMHFWLRQ ...
Страница 136: ...130 Testing the interaction of the distance protection KDSWHU 9HULI LQJ WKH LQWHUQDO FRQILJXUDWLRQ ...
Страница 140: ...134 Testing the interaction of the distance protection KDSWHU 7HVWLQJ WKH SURWHFWLRQ V VWHP ...