
4.
Drill holes of appropriate sizes in the AC cabinet cover and install cable glands to ensure
that IP protection is established.
Multicore cabling (3-phase)
Individual cabling (single phase)
5.
Route the cables inside the AC cabinet.
6.
Connect the cables to the correct fuse base terminals in the AC cabinet. Tighten the
connections.
Note:
You can connect the fuse base without terminating the LV AC cables.
Electrical installation 45
11
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......