
Mechanical installation
Contents of this chapter
This chapter describes the mechanical installation of the PVS-175 medium voltage station
(MVS) and gives instructions on how to select the location and guidelines to build the
foundation for the MVS. Always obey the local regulations.
Safety
See
.
Before you move the MVS, see instructions in chapter
Tools
Use the following tools to move the MVS, to fasten the MVS foundation, and to tighten the
connections:
•
Crane, forklift, or pallet truck (with sufficient load capacity)
•
Pozidriv and Torx (2.5 to 6 mm) screwdrivers with short and long heads or bits
•
Torque wrench
•
Set of wrenches and sockets.
Foundation guidelines
For information on the MVS dimensions and footprint, see drawing
3AES-PVS-175-MVS-30-DW02.
Always follow the local rules and laws when designing and constructing the foundation. Pay
attention to the proper planning and constructing of the foundation. For example, an improper
foundation can cause settling of the MVS or difficulty opening the door.
4
Mechanical installation 33
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......